IAC logo
IAC Assessment: MA0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product paper
NAICS n/a
SIC 2621 - Paper Mills
Sales $5,000,000-$10,000,000
# of Employees 89
Plant Area (Sq.Ft.) 333,000
Annual Production 7,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $334,482 5,470,692 kWh $0.06
Electricity Demand $54,792 26,547 kW-months/year $2.06
Electricity Fees $6,996 - $ -
Other Energy $411,341 80,400 MMBtu $5.12
TOTAL ENERGY COSTS $934,235
RECOMMENDED SAVINGS* $207,320 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $164,672
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Energy Water Disposal Primary Raw Material Water Consumption By-product Production Electricity Usage Electricity Demand Electricity Fees Other Energy Water Disposal Primary Raw Material Water Consumption By-product Production
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal $ $
01: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$109,702
Cost:
$40,000
$102,709 1,974,209 - - - - - (-6,736) - - - - - - $6,993 - $102,709
1,974,209
kWh
-
-
kW-months/year
-
-
$
-
(-6,736)
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
$6,993
-
$
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$30,286
Cost:
$11,000
- - - - - - - - $3,301 5,100,000 $26,985 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,301
5,100,000
Tgal
$26,985
-
$
-
-
Tgal
-
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$29,467
Cost:
$6,350
- - - - - - $29,467 6,043 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$29,467
6,043
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$18,658
Cost:
$18,595
- - - - - - $18,658 3,527 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$18,658
3,527
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$10,690
Cost:
-
- - - - $3,512 - - - - - - - $7,178 - - - -
-
kWh
-
-
kW-months/year
$3,512
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
$7,178
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,026
Cost:
$14,436
$5,645 92,321 $381 185 - - - - - - - - - - - - $5,645
92,321
kWh
$381
185
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,613
Cost:
$280
$1,613 26,377 - - - - - - - - - - - - - - $1,613
26,377
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$878
Cost:
$902
$878 14,361 - - - - - - - - - - - - - - $878
14,361
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$207,320
Cost:
$91,563
$110,845 2,107,268 $381 185 $3,512 - $48,125 2,834 $3,301 5,100,000 $26,985 - $7,178 - $6,993 - $110,845
2,107,268
kWh
$381
185
kW-months/year
$3,512
-
$
$48,125
2,834
MMBtu
$3,301
5,100,000
Tgal
$26,985
-
$
$7,178
-
Tgal
$6,993
-
$
TOTAL IMPLEMENTED Savings:
$164,672
Cost:
$84,031
$108,354 2,066,530 $381 185 - - $18,658 (-3,209) $3,301 5,100,000 $26,985 - - - $6,993 - $108,354
2,066,530
kWh
$381
185
kW-months/year
-
-
$
$18,658
(-3,209)
MMBtu
$3,301
5,100,000
Tgal
$26,985
-
$
-
-
Tgal
$6,993
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Other Energy Water Disposal Primary Raw Material Water Consumption By-product Production Electricity Usage Electricity Demand Electricity Fees Other Energy Water Disposal Primary Raw Material Water Consumption By-product Production