IAC logo
IAC Assessment: MA0373
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0373
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product Acoustical Insulation
NAICS n/a
SIC 3401 -
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 82,000
Annual Production 0 Units
Production Hrs. Annual 2,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $18,796 268,464 kWh $0.07
Electricity Demand $25,793 1,734 kW-months/year $14.87
Natural Gas $21,159 2,409 MMBtu $8.78
TOTAL ENERGY COSTS $65,748
RECOMMENDED SAVINGS* $20,645 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $843
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$12,250
Cost:
$3,800
- - - - - - $12,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,250
-
lb
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$4,884
Cost:
$705
$4,884 70,340 - - - - - - $4,884
70,340
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,081
Cost:
$9,888
$1,169 16,706 $912 80 - - - - $1,169
16,706
kWh
$912
80
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$843
Cost:
$448
- - - - $843 129 - - -
-
kWh
-
-
kW-months/year
$843
129
MMBtu
-
-
lb
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$587
Cost:
$2,000
- - - - $587 89 - - -
-
kWh
-
-
kW-months/year
$587
89
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$20,645
Cost:
$16,841
$6,053 87,046 $912 80 $1,430 218 $12,250 - $6,053
87,046
kWh
$912
80
kW-months/year
$1,430
218
MMBtu
$12,250
-
lb
TOTAL IMPLEMENTED Savings:
$843
Cost:
$448
- - - - $843 129 - - -
-
kWh
-
-
kW-months/year
$843
129
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)