Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1997 |
Principal Product | Paper |
NAICS | n/a |
SIC | 2621 - Paper Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 35,000,000 Tons |
Production Hrs. Annual | 8,568 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,095,657 | 17,065,358 | kWh | $0.06 |
Fuel Oil #6 | $726,901 | 230,354 | MMBtu | $3.16 |
TOTAL ENERGY COSTS | $2,498,628 | |||
RECOMMENDED SAVINGS* | $465,026 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $138,427 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Fuel Oil #6 | Other Liquid (non-haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.7211 MODIFY MATERIAL APPLICATION METHODS |
Savings: $267,300 Cost: $50,000 |
- | - | - | - | - | - | $267,300 | 594,000 |
- - kWh |
- - MMBtu |
- - gal |
$267,300 594,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $131,859 Cost: $311,500 |
$(-42,966) | (-967,175) | $174,825 | 55,500 | - | - | - | - |
$(-42,966) (-967,175) kWh |
$174,825 55,500 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $52,705 Cost: $65,650 |
$52,705 | 1,186,401 | - | - | - | - | - | - |
$52,705 1,186,401 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,568 Cost: $31,829 |
$6,568 | 102,579 | - | - | - | - | - | - |
$6,568 102,579 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4145 USE MAGNETIC TECHNOLOGY TO TREAT WATER |
Savings: $5,865 Cost: $10,640 |
- | - | - | - | $5,865 | 79 | - | - |
- - kWh |
- - MMBtu |
$5,865 79 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $729 Cost: $1,000 |
$729 | 16,413 | - | - | - | - | - | - |
$729 16,413 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $465,026 Cost: $470,619 |
$17,036 | 338,218 | $174,825 | 55,500 | $5,865 | 79 | $267,300 | 594,000 | $17,036 338,218 kWh |
$174,825 55,500 MMBtu |
$5,865 79 gal |
$267,300 594,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $138,427 Cost: $343,329 |
$(-36,398) | (-864,596) | $174,825 | 55,500 | - | - | - | - | $(-36,398) (-864,596) kWh |
$174,825 55,500 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #6 | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Fuel Oil #6 | Other Liquid (non-haz) | Solid Waste (non-haz) |