IAC Assessment: MA0385
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0385
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product Paper
NAICS n/a
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 125,000
Annual Production 35,000,000 Tons
Production Hrs. Annual 8,568
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,095,657 17,065,358 kWh $0.06
Fuel Oil #6 $726,901 230,354 MMBtu $3.16
TOTAL ENERGY COSTS $2,498,628
RECOMMENDED SAVINGS* $465,026 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $138,427
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Fuel Oil #6 Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ MMBtu $ gal $ lb
01: 3.7211 MODIFY MATERIAL APPLICATION METHODS Savings:
$267,300
Cost:
$50,000
- - - - - - $267,300 594,000 -
-
kWh
-
-
MMBtu
-
-
gal
$267,300
594,000
lb
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$131,859
Cost:
$311,500
$(-42,966) (-967,175) $174,825 55,500 - - - - $(-42,966)
(-967,175)
kWh
$174,825
55,500
MMBtu
-
-
gal
-
-
lb
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$52,705
Cost:
$65,650
$52,705 1,186,401 - - - - - - $52,705
1,186,401
kWh
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,568
Cost:
$31,829
$6,568 102,579 - - - - - - $6,568
102,579
kWh
-
-
MMBtu
-
-
gal
-
-
lb
05: 3.4145 USE MAGNETIC TECHNOLOGY TO TREAT WATER Savings:
$5,865
Cost:
$10,640
- - - - $5,865 79 - - -
-
kWh
-
-
MMBtu
$5,865
79
gal
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$729
Cost:
$1,000
$729 16,413 - - - - - - $729
16,413
kWh
-
-
MMBtu
-
-
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$465,026
Cost:
$470,619
$17,036 338,218 $174,825 55,500 $5,865 79 $267,300 594,000 $17,036
338,218
kWh
$174,825
55,500
MMBtu
$5,865
79
gal
$267,300
594,000
lb
TOTAL IMPLEMENTED Savings:
$138,427
Cost:
$343,329
$(-36,398) (-864,596) $174,825 55,500 - - - - $(-36,398)
(-864,596)
kWh
$174,825
55,500
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ gal $ lb
Electricity Usage Fuel Oil #6 Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Fuel Oil #6 Other Liquid (non-haz) Solid Waste (non-haz)