Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1997 |
Principal Product | Antique Style Furniture |
NAICS | n/a |
SIC | 2512 - Upholstered Household Furniture |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 6,000 Pieces |
Production Hrs. Annual | 2,340 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $28,207 | 339,683 | kWh | $0.08 |
Electricity Demand | $21,692 | 1,585 | kW-months/year | $13.69 |
Electricity Fees | $1,777 | - | $ | - |
Natural Gas | $12,394 | 1,285 | MMBtu | $9.65 |
Fuel Oil #2 | $58,707 | 10,110 | MMBtu | $5.81 |
TOTAL ENERGY COSTS | $122,777 | |||
RECOMMENDED SAVINGS* | $5,664 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,993 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Fuel Oil #2 | Administrative Changes | Electricity Usage | Electricity Fees | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $2,061 Cost: - |
- | - | - | - | - | - | $2,061 | - |
- - kWh |
- - $ |
- - MMBtu |
$2,061 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,610 Cost: $2,100 |
$1,610 | 18,464 | - | - | - | - | - | - |
$1,610 18,464 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $592 Cost: $860 |
- | - | - | - | $592 | 91 | - | - |
- - kWh |
- - $ |
$592 91 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $565 Cost: - |
$565 | 17,878 | - | - | - | - | - | - |
$565 17,878 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS |
Savings: $538 Cost: $60 |
- | - | $538 | - | - | - | - | - |
- - kWh |
$538 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $298 Cost: $75 |
$298 | 15,240 | - | - | - | - | - | - |
$298 15,240 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $5,664 Cost: $3,095 |
$2,473 | 51,582 | $538 | - | $592 | 91 | $2,061 | - | $2,473 51,582 kWh |
$538 - $ |
$592 91 MMBtu |
$2,061 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,993 Cost: $995 |
$863 | 33,118 | $538 | - | $592 | 91 | - | - | $863 33,118 kWh |
$538 - $ |
$592 91 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Fuel Oil #2 | Administrative Changes | Electricity Usage | Electricity Fees | Fuel Oil #2 | Administrative Changes |