IAC logo
IAC Assessment: MA0393
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0393
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product Electro-Magnetic Coil Windings
NAICS n/a
SIC 3677 - Electronic Coils And Transformers
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 29,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,500
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,215 1,302,462 kWh $0.09
Electricity Demand $40,052 4,198 kW-months/year $9.54
Natural Gas $9,762 1,111 MMBtu $8.79
TOTAL ENERGY COSTS $185,261
RECOMMENDED SAVINGS* $106,252 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $106,252
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ lb $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$92,750
Cost:
$68,000
- - - - - - $92,750 - -
-
kWh
-
-
kW-months/year
-
-
lb
$92,750
-
$
02: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$8,750
Cost:
$1,000
- - - - - - $8,750 - -
-
kWh
-
-
kW-months/year
-
-
lb
$8,750
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,550
Cost:
$356
$2,550 43,669 - - - - - - $2,550
43,669
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,895
Cost:
$10
$1,654 28,429 $241 48 - - - - $1,654
28,429
kWh
$241
48
kW-months/year
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$160
Cost:
-
- - - - $160 2,073,600 - - -
-
kWh
-
-
kW-months/year
$160
2,073,600
lb
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$147
Cost:
-
$147 2,345 - - - - - - $147
2,345
kWh
-
-
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$106,252
Cost:
$69,366
$4,351 74,443 $241 48 $160 2,073,600 $101,500 - $4,351
74,443
kWh
$241
48
kW-months/year
$160
2,073,600
lb
$101,500
-
$
TOTAL IMPLEMENTED Savings:
$106,252
Cost:
$69,366
$4,351 74,443 $241 48 $160 2,073,600 $101,500 - $4,351
74,443
kWh
$241
48
kW-months/year
$160
2,073,600
lb
$101,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material