Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1997 |
Principal Product | electronic components |
NAICS | n/a |
SIC | 3679 - Electronic Components, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 320,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Demand | $582,832 | 34,518 | kW-months/year | $16.88 |
Natural Gas | $105,512 | 18,857 | MMBtu | $5.60 |
Fuel Oil #4 | $59,998 | 14,413 | MMBtu | $4.16 |
TOTAL ENERGY COSTS | $748,342 | |||
RECOMMENDED SAVINGS* | $361,610 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $352,927 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $262,500 Cost: - |
- | - | - | - | - | - | $262,500 | - |
- - kWh |
- - kW-months/year |
- - lb |
$262,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $89,097 Cost: $320,340 |
$63,991 | 971,571 | $25,106 | 2,640 | - | - | - | - |
$63,991 971,571 kWh |
$25,106 2,640 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,317 Cost: $24,908 |
$2,778 | 43,083 | $1,539 | 162 | - | - | - | - |
$2,778 43,083 kWh |
$1,539 162 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,246 Cost: $4,225 |
$2,333 | 35,463 | $913 | 96 | - | - | - | - |
$2,333 35,463 kWh |
$913 96 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,330 Cost: $271 |
$1,330 | 20,223 | - | - | - | - | - | - |
$1,330 20,223 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL |
Savings: $1,120 Cost: - |
- | - | - | - | $1,120 | 2,500 | - | - |
- - kWh |
- - kW-months/year |
$1,120 2,500 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $361,610 Cost: $349,744 |
$70,432 | 1,070,340 | $27,558 | 2,898 | $1,120 | 2,500 | $262,500 | - | $70,432 1,070,340 kWh |
$27,558 2,898 kW-months/year |
$1,120 2,500 lb |
$262,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $352,927 Cost: $320,611 |
$65,321 | 991,794 | $25,106 | 2,640 | - | - | $262,500 | - | $65,321 991,794 kWh |
$25,106 2,640 kW-months/year |
- - lb |
$262,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production |