Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1997 |
Principal Product | Specialized Industrial Machinery, NFC |
NAICS | n/a |
SIC | 3559 - Special Industry Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 26,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,810 |
Location (State) | RI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $41,424 | 505,569 | kWh | $0.08 |
Electricity Demand | $15,238 | 2,881 | kW-months/year | $5.29 |
Natural Gas | $25,931 | 2,955 | MMBtu | $8.78 |
TOTAL ENERGY COSTS | $82,593 | |||
RECOMMENDED SAVINGS* | $11,720 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,863 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,098 Cost: $34,200 |
$5,146 | 73,857 | $952 | 180 | - | - | - | - |
$5,146 73,857 kWh |
$952 180 kW-months/year |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $2,759 Cost: $10,560 |
$(-169) | (-1,758) | - | - | - | - | $2,928 | - |
$(-169) (-1,758) kWh |
- - kW-months/year |
- - $ |
$2,928 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,450 Cost: $384 |
$1,450 | 20,809 | - | - | - | - | - | - |
$1,450 20,809 kWh |
- - kW-months/year |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $1,067 Cost: - |
- | - | - | - | $1,067 | - | - | - |
- - kWh |
- - kW-months/year |
$1,067 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $346 Cost: - |
- | - | - | - | $346 | - | - | - |
- - kWh |
- - kW-months/year |
$346 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,720 Cost: $45,144 |
$6,427 | 92,908 | $952 | 180 | $1,413 | - | $2,928 | - | $6,427 92,908 kWh |
$952 180 kW-months/year |
$1,413 - $ |
$2,928 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,863 Cost: $384 |
$1,450 | 20,809 | - | - | $1,413 | - | - | - | $1,450 20,809 kWh |
- - kW-months/year |
$1,413 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Administrative Changes | Water Consumption |