IAC logo
IAC Assessment: MA0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0418
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1998
Principal Product Tempered and Annealed Glas
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $5,000,000-$10,000,000
# of Employees 54
Plant Area (Sq.Ft.) 89,000
Annual Production 3,250 Thousand Feet
Production Hrs. Annual 4,160
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,488 2,957,796 kWh $0.06
Electricity Demand $24,514 2,604 kW-months/year $9.41
Natural Gas $24,793 3,704 MMBtu $6.69
TOTAL ENERGY COSTS $240,795
RECOMMENDED SAVINGS* $59,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $301
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$46,132
Cost:
$1,000,000
$66,091 1,146,835 - - $(-19,959) (-4,402) $66,091
1,146,835
kWh
-
-
kW-months/year
$(-19,959)
(-4,402)
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,390
Cost:
$35,000
$11,390 180,539 - - - - $11,390
180,539
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,415
Cost:
$7,983
$1,035 16,413 $380 44 - - $1,035
16,413
kWh
$380
44
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$163
Cost:
$261
$163 2,638 - - - - $163
2,638
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$138
Cost:
-
$138 2,345 - - - - $138
2,345
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$59,238
Cost:
$1,043,244
$78,817 1,348,770 $380 44 $(-19,959) (-4,402) $78,817
1,348,770
kWh
$380
44
kW-months/year
$(-19,959)
(-4,402)
MMBtu
TOTAL IMPLEMENTED Savings:
$301
Cost:
$261
$301 4,983 - - - - $301
4,983
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas