Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1998 |
Principal Product | Aluminuma and Zinc Die Castings |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 6,422 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $354,262 | 5,911,782 | kWh | $0.06 |
Electricity Demand | $124,658 | 12,816 | kW-months/year | $9.73 |
Natural Gas | $329,243 | 91,614 | MMBtu | $3.59 |
TOTAL ENERGY COSTS | $808,636 | |||
RECOMMENDED SAVINGS* | $280,914 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $242,183 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2514 COVER OPEN TANKS |
Savings: $168,295 Cost: $5,000 |
- | - | - | - | $1,450 | 500 | $166,845 | 194,986 | - | - |
- - kWh |
- - kW-months/year |
$1,450 500 MMBtu |
$166,845 194,986 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $54,360 Cost: $118,235 |
$36,853 | 590,270 | $17,507 | 1,837 | - | - | - | - | - | - |
$36,853 590,270 kWh |
$17,507 1,837 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $36,192 Cost: $201,500 |
- | - | - | - | $36,192 | 12,480 | - | - | - | - |
- - kWh |
- - kW-months/year |
$36,192 12,480 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE |
Savings: $10,000 Cost: $3,120 |
- | - | - | - | - | - | - | - | $10,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$10,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $3,822 Cost: $9,000 |
- | - | - | - | $3,822 | 565 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,822 565 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $3,967 Cost: - |
- | - | - | - | - | - | - | - | $3,967 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$3,967 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,739 Cost: - |
$1,739 | 27,843 | - | - | - | - | - | - | - | - |
$1,739 27,843 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,539 Cost: $7,125 |
- | - | - | - | - | - | - | - | $2,539 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$2,539 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $280,914 Cost: $343,980 |
$38,592 | 618,113 | $17,507 | 1,837 | $41,464 | 13,545 | $166,845 | 194,986 | $16,506 | - | $38,592 618,113 kWh |
$17,507 1,837 kW-months/year |
$41,464 13,545 MMBtu |
$166,845 194,986 lb |
$16,506 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $242,183 Cost: $135,355 |
$38,592 | 618,113 | $17,507 | 1,837 | $5,272 | 1,065 | $166,845 | 194,986 | $13,967 | - | $38,592 618,113 kWh |
$17,507 1,837 kW-months/year |
$5,272 1,065 MMBtu |
$166,845 194,986 lb |
$13,967 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | By-product Production |