Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1998 |
Principal Product | Finished Fabrics |
NAICS | n/a |
SIC | 2394 - Canvas And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 89,000 |
Annual Production | 120,000 Thousand Feet |
Production Hrs. Annual | 6,120 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $372,950 | 4,076,788 | kWh | $0.09 |
Electricity Demand | $197,531 | 12,646 | kW-months/year | $15.62 |
Natural Gas | $783,606 | 171,836 | MMBtu | $4.56 |
Fuel Oil #6 | $94,320 | 38,975 | MMBtu | $2.42 |
TOTAL ENERGY COSTS | $1,449,207 | |||
RECOMMENDED SAVINGS* | $315,261 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,106 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $263,073 Cost: $1,000,000 |
$222,000 | 3,701,055 | $171,820 | 11,000 | $(-181,127) | (-33,446) | $50,380 | 20,818 | - | - |
$222,000 3,701,055 kWh |
$171,820 11,000 kW-months/year |
$(-181,127) (-33,446) MMBtu |
$50,380 20,818 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $16,538 Cost: $30,400 |
$(-70) | (-1,172) | $(-422) | (-27) | $10,757 | 2,592 | $6,273 | 2,592 | - | - |
$(-70) (-1,172) kWh |
$(-422) (-27) kW-months/year |
$10,757 2,592 MMBtu |
$6,273 2,592 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $20,197 Cost: $21,808 |
$(-9,186) | (-153,576) | $(-4,702) | (-301) | $21,530 | 5,188 | $12,555 | 5,188 | - | - |
$(-9,186) (-153,576) kWh |
$(-4,702) (-301) kW-months/year |
$21,530 5,188 MMBtu |
$12,555 5,188 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $12,411 Cost: $10,638 |
$(-88) | (-1,465) | $(-78) | (-5) | $7,943 | 1,915 | $4,634 | 1,915 | - | - |
$(-88) (-1,465) kWh |
$(-78) (-5) kW-months/year |
$7,943 1,915 MMBtu |
$4,634 1,915 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $1,568 Cost: - |
- | - | - | - | - | - | - | - | $1,568 | 32,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$1,568 32,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,474 Cost: $5,800 |
$1,474 | 24,619 | - | - | - | - | - | - | - | - |
$1,474 24,619 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $315,261 Cost: $1,068,646 |
$214,130 | 3,569,461 | $166,618 | 10,667 | $(-140,897) | (-23,751) | $73,842 | 30,513 | $1,568 | 32,000 | $214,130 3,569,461 kWh |
$166,618 10,667 kW-months/year |
$(-140,897) (-23,751) MMBtu |
$73,842 30,513 MMBtu |
$1,568 32,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,106 Cost: $30,400 |
$(-70) | (-1,172) | $(-422) | (-27) | $10,757 | 2,592 | $6,273 | 2,592 | $1,568 | 32,000 | $(-70) (-1,172) kWh |
$(-422) (-27) kW-months/year |
$10,757 2,592 MMBtu |
$6,273 2,592 MMBtu |
$1,568 32,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Solid Waste (non-haz) |