Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1998 |
Principal Product | Rubber Boots |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 225,000 |
Annual Production | 3,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $331,765 | 4,742,380 | kWh | $0.07 |
Electricity Demand | $153,112 | 11,796 | kW-months/year | $12.98 |
LPG | $13,513 | 1,250 | MMBtu | $10.81 |
Fuel Oil #2 | $9,290 | 1,725 | MMBtu | $5.39 |
TOTAL ENERGY COSTS | $513,890 | |||
RECOMMENDED SAVINGS* | $84,724 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,634 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $5,357 Cost: $300 |
- | - | - | - | $3,583 | 331 | $1,774 | 331 | - | - |
- - kWh |
- - kW-months/year |
$3,583 331 MMBtu |
$1,774 331 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,264 Cost: - |
$1,264 | 15,240 | - | - | - | - | - | - | - | - |
$1,264 15,240 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $711 Cost: $1,840 |
$711 | 8,499 | - | - | - | - | - | - | - | - |
$711 8,499 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,777 Cost: $10,080 |
$2,259 | 26,964 | $518 | 54 | - | - | - | - | - | - |
$2,259 26,964 kWh |
$518 54 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,070 Cost: $27,413 |
$4,354 | 52,169 | $2,716 | 283 | - | - | - | - | - | - |
$4,354 52,169 kWh |
$2,716 283 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $56,116 Cost: $21,247 |
$50,762 | 606,975 | $8,838 | 922 | - | - | - | - | $(-3,484) | (-871,000) |
$50,762 606,975 kWh |
$8,838 922 kW-months/year |
- - MMBtu |
- - MMBtu |
$(-3,484) (-871,000) Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $2,518 Cost: $800 |
$2,518 | 30,188 | - | - | - | - | - | - | - | - |
$2,518 30,188 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,048 Cost: $75 |
$1,048 | 12,603 | - | - | - | - | - | - | - | - |
$1,048 12,603 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,863 Cost: $15,850 |
$7,863 | 94,080 | - | - | - | - | - | - | - | - |
$7,863 94,080 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $84,724 Cost: $77,605 |
$70,779 | 846,718 | $12,072 | 1,259 | $3,583 | 331 | $1,774 | 331 | $(-3,484) | (-871,000) | $70,779 846,718 kWh |
$12,072 1,259 kW-months/year |
$3,583 331 MMBtu |
$1,774 331 MMBtu |
$(-3,484) (-871,000) Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,634 Cost: $3,015 |
$4,277 | 51,290 | - | - | $3,583 | 331 | $1,774 | 331 | - | - | $4,277 51,290 kWh |
- - kW-months/year |
$3,583 331 MMBtu |
$1,774 331 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal |