IAC Assessment: MA0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product High speed spin testing
NAICS n/a
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 9,000
Annual Production 0 Units
Production Hrs. Annual 4,310
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,191 1,261,137 kWh $0.07
Electricity Demand $64,841 6,721 kW-months/year $9.65
Fuel Oil #2 $2,491 399 MMBtu $6.24
TOTAL ENERGY COSTS $158,523
RECOMMENDED SAVINGS* $4,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $301
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,090
Cost:
$8,125
- - $3,090 316 -
-
kWh
$3,090
316
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$652
Cost:
$2,185
$456 7,034 $196 20 $456
7,034
kWh
$196
20
kW-months/year
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$230
Cost:
$130
$230 4,689 - - $230
4,689
kWh
-
-
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$71
Cost:
$50
$71 1,465 - - $71
1,465
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$4,043
Cost:
$10,490
$757 13,188 $3,286 336 $757
13,188
kWh
$3,286
336
kW-months/year
TOTAL IMPLEMENTED Savings:
$301
Cost:
$180
$301 6,154 - - $301
6,154
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand