IAC Assessment: MA0442
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0442
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product Forged and Cast Metal Products
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 90,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $319,455 4,412,954 kWh $0.07
Electricity Demand $52,708 14,520 kW-months/year $3.63
Natural Gas $132,945 31,351 MMBtu $4.24
Fuel Oil #2 $25,390 5,273 MMBtu $4.82
TOTAL ENERGY COSTS $530,498
RECOMMENDED SAVINGS* $285,244 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,399
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$186,395
Cost:
$900,000
$(-15,590) (-227,433) $(-4,761) (-109) $11,746 2,715 $195,000 - $(-15,590)
(-227,433)
kWh
$(-4,761)
(-109)
kW-months/year
$11,746
2,715
MMBtu
$195,000
-
$
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$73,450
Cost:
$125,600
- - - - - - $73,450 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$73,450
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$19,396
Cost:
$38,500
$21,557 314,478 $3,292 907 $(-5,453) (-1,262) - - $21,557
314,478
kWh
$3,292
907
kW-months/year
$(-5,453)
(-1,262)
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,380
Cost:
$11,544
$3,737 54,513 $643 105 - - - - $3,737
54,513
kWh
$643
105
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$964
Cost:
$2,575
$964 14,068 - - - - - - $964
14,068
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$402
Cost:
$955
$402 5,862 - - - - - - $402
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$257
Cost:
$640
$151 2,052 - - $106 33 - - $151
2,052
kWh
-
-
kW-months/year
$106
33
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$285,244
Cost:
$1,079,814
$11,221 163,540 $(-826) 903 $6,399 1,486 $268,450 - $11,221
163,540
kWh
$(-826)
903
kW-months/year
$6,399
1,486
MMBtu
$268,450
-
$
TOTAL IMPLEMENTED Savings:
$25,399
Cost:
$54,214
$26,811 390,973 $3,935 1,012 $(-5,347) (-1,229) - - $26,811
390,973
kWh
$3,935
1,012
kW-months/year
$(-5,347)
(-1,229)
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production