IAC Assessment: MA0444
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0444
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product Thick Plastic Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 48
Plant Area (Sq.Ft.) 62,000
Annual Production 5,265,000 Pounds
Production Hrs. Annual 6,120
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,372 2,526,378 kWh $0.06
Electricity Demand $42,251 7,425 kW-months/year $5.69
Natural Gas $2,713 198 MMBtu $13.70
TOTAL ENERGY COSTS $197,336
RECOMMENDED SAVINGS* $7,242 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,483
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,858
Cost:
-
$1,858 28,722 - - - - $1,858
28,722
kWh
-
-
kW-months/year
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$303
Cost:
$117
$303 4,689 - - - - $303
4,689
kWh
-
-
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$322
Cost:
$248
$322 4,982 - - - - $322
4,982
kWh
-
-
kW-months/year
-
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$879
Cost:
$4,225
$723 11,137 $156 43 - - $723
11,137
kWh
$156
43
kW-months/year
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$114
Cost:
$470
$114 1,758 - - - - $114
1,758
kWh
-
-
kW-months/year
-
-
$
06: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$3,766
Cost:
-
- - $7,463 2,056 $(-3,697) - -
-
kWh
$7,463
2,056
kW-months/year
$(-3,697)
-
$
TOTAL RECOMMENDED Savings:
$7,242
Cost:
$5,060
$3,320 51,288 $7,619 2,099 $(-3,697) - $3,320
51,288
kWh
$7,619
2,099
kW-months/year
$(-3,697)
-
$
TOTAL IMPLEMENTED Savings:
$2,483
Cost:
$365
$2,483 38,393 - - - - $2,483
38,393
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes