IAC logo
IAC Assessment: MA0450
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0450
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product Thermoformed plastics
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 70,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,322 1,518,171 kWh $0.06
Electricity Demand $35,700 6,060 kW-months/year $5.89
Electricity Fees $14,212 - $ -
Natural Gas $10,534 1,870 MMBtu $5.63
TOTAL ENERGY COSTS $150,768
RECOMMENDED SAVINGS* $83,968 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,894
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$75,618
Cost:
$250,000
$55,447 873,681 $36,677 5,038 $(-16,506) (-3,726) $55,447
873,681
kWh
$36,677
5,038
kW-months/year
$(-16,506)
(-3,726)
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,042
Cost:
$1,000
$1,042 16,413 - - - - $1,042
16,413
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,892
Cost:
$5,813
$5,301 83,529 $1,168 160 $(-1,577) (-356) $5,301
83,529
kWh
$1,168
160
kW-months/year
$(-1,577)
(-356)
MMBtu
04: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$456
Cost:
$1,275
$456 7,327 - - - - $456
7,327
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,423
Cost:
$5,216
$856 13,482 $567 78 - - $856
13,482
kWh
$567
78
kW-months/year
-
-
MMBtu
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$537
Cost:
-
$294 4,689 $243 33 - - $294
4,689
kWh
$243
33
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$83,968
Cost:
$263,304
$63,396 999,121 $38,655 5,309 $(-18,083) (-4,082) $63,396
999,121
kWh
$38,655
5,309
kW-months/year
$(-18,083)
(-4,082)
MMBtu
TOTAL IMPLEMENTED Savings:
$7,894
Cost:
$12,029
$7,493 118,113 $1,978 271 $(-1,577) (-356) $7,493
118,113
kWh
$1,978
271
kW-months/year
$(-1,577)
(-356)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas