IAC logo
IAC Assessment: MA0457
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0457
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Flocked Cloth
NAICS n/a
SIC 2299 - Textile Goods, Nec
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 197,040
Annual Production 45,000 Thousand Feet
Production Hrs. Annual 8,232
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $550,662 8,071,219 kWh $0.07
Electricity Demand $81,232 16,789 kW-months/year $4.84
Electricity Fees $34,368 - $ -
Natural Gas $411,201 60,741 MMBtu $6.77
Fuel Oil #6 $41,472 17,596 MMBtu $2.36
TOTAL ENERGY COSTS $1,280,934
RECOMMENDED SAVINGS* $205,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,248
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Water Disposal By-product Production Electricity Usage Electricity Demand Fuel Oil #6 Water Disposal By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$113,982
Cost:
$160,909
$94,378 1,490,328 $36,590 2,172 $(-13,986) (-4,045) - - $(-3,000) - $94,378
1,490,328
kWh
$36,590
2,172
kW-months/year
$(-13,986)
(-4,045)
MMBtu
-
-
Tgal
$(-3,000)
-
$
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$55,054
Cost:
$400,000
- - - - - - $67,054 27,409,823 $(-12,000) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$67,054
27,409,823
Tgal
$(-12,000)
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$24,685
Cost:
$33,280
- - - - $24,685 7,155 - - - - -
-
kWh
-
-
kW-months/year
$24,685
7,155
MMBtu
-
-
Tgal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,519
Cost:
$9,750
$8,519 134,525 - - - - - - - - $8,519
134,525
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,246
Cost:
$4,225
$2,246 35,463 - - - - - - - - $2,246
35,463
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,317
Cost:
$2,000
$1,129 17,878 $188 38 - - - - - - $1,129
17,878
kWh
$188
38
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$205,803
Cost:
$610,164
$106,272 1,678,194 $36,778 2,210 $10,699 3,110 $67,054 27,409,823 $(-15,000) - $106,272
1,678,194
kWh
$36,778
2,210
kW-months/year
$10,699
3,110
MMBtu
$67,054
27,409,823
Tgal
$(-15,000)
-
$
TOTAL IMPLEMENTED Savings:
$28,248
Cost:
$39,505
$3,375 53,341 $188 38 $24,685 7,155 - - - - $3,375
53,341
kWh
$188
38
kW-months/year
$24,685
7,155
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Fuel Oil #6 Water Disposal By-product Production Electricity Usage Electricity Demand Fuel Oil #6 Water Disposal By-product Production