IAC Assessment: MA0459
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0459
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Pressure Sensitive Adhesives on Various Substrates
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 47
Plant Area (Sq.Ft.) 44,000
Annual Production 0 Units
Production Hrs. Annual 2,142
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,116 518,464 kWh $0.06
Electricity Demand $12,147 1,987 kW-months/year $6.11
Electricity Fees $167 - $ -
Natural Gas $90,902 21,012 MMBtu $4.33
TOTAL ENERGY COSTS $136,890
RECOMMENDED SAVINGS* $5,676 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,908
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,945
Cost:
$7,695
$500 9,379 $414 70 - - $2,031 607,897 $500
9,379
kWh
$414
70
kW-months/year
-
-
MMBtu
$2,031
607,897
Tgal
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,064
Cost:
$150
$983 18,464 - - $81 22 - - $983
18,464
kWh
-
-
kW-months/year
$81
22
MMBtu
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$789
Cost:
$150
$789 13,775 - - - - - - $789
13,775
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$557
Cost:
$1,275
- - $557 94 - - - - -
-
kWh
$557
94
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$266
Cost:
$1,250
$266 4,982 - - - - - - $266
4,982
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$55
Cost:
$248
$55 1,172 - - - - - - $55
1,172
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$5,676
Cost:
$10,768
$2,593 47,772 $971 164 $81 22 $2,031 607,897 $2,593
47,772
kWh
$971
164
kW-months/year
$81
22
MMBtu
$2,031
607,897
Tgal
TOTAL IMPLEMENTED Savings:
$1,908
Cost:
$548
$1,827 33,411 - - $81 22 - - $1,827
33,411
kWh
-
-
kW-months/year
$81
22
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal