Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2000 |
Principal Product | Pressure Sensitive Adhesives on Various Substrates |
NAICS | n/a |
SIC | 3479 - Metal Coating And Allied Services |
Sales | $5,000,000-$10,000,000 |
# of Employees | 47 |
Plant Area (Sq.Ft.) | 44,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,142 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $31,116 | 518,464 | kWh | $0.06 |
Electricity Demand | $12,147 | 1,987 | kW-months/year | $6.11 |
Electricity Fees | $167 | - | $ | - |
Natural Gas | $90,902 | 21,012 | MMBtu | $4.33 |
TOTAL ENERGY COSTS | $136,890 | |||
RECOMMENDED SAVINGS* | $5,676 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,908 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $2,945 Cost: $7,695 |
$500 | 9,379 | $414 | 70 | - | - | $2,031 | 607,897 |
$500 9,379 kWh |
$414 70 kW-months/year |
- - MMBtu |
$2,031 607,897 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,064 Cost: $150 |
$983 | 18,464 | - | - | $81 | 22 | - | - |
$983 18,464 kWh |
- - kW-months/year |
$81 22 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $789 Cost: $150 |
$789 | 13,775 | - | - | - | - | - | - |
$789 13,775 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $557 Cost: $1,275 |
- | - | $557 | 94 | - | - | - | - |
- - kWh |
$557 94 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $266 Cost: $1,250 |
$266 | 4,982 | - | - | - | - | - | - |
$266 4,982 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $55 Cost: $248 |
$55 | 1,172 | - | - | - | - | - | - |
$55 1,172 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $5,676 Cost: $10,768 |
$2,593 | 47,772 | $971 | 164 | $81 | 22 | $2,031 | 607,897 | $2,593 47,772 kWh |
$971 164 kW-months/year |
$81 22 MMBtu |
$2,031 607,897 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,908 Cost: $548 |
$1,827 | 33,411 | - | - | $81 | 22 | - | - | $1,827 33,411 kWh |
- - kW-months/year |
$81 22 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |