IAC logo
IAC Assessment: MA0460
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0460
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Carbon Seals and Bearings
NAICS n/a
SIC 3568 - Power Transmission Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 55,000
Annual Production 600,000 Pounds
Production Hrs. Annual 6,240
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $405,593 6,592,907 kWh $0.06
Electricity Demand $36,016 12,720 kW-months/year $2.83
Electricity Fees $3,134 - $ -
Natural Gas $82,243 16,113 MMBtu $5.10
TOTAL ENERGY COSTS $558,416
RECOMMENDED SAVINGS* $118,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,769
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$69,572
Cost:
$286,600
$88,211 1,379,543 $7,191 2,541 $(-25,830) (-5,884) - - $88,211
1,379,543
kWh
$7,191
2,541
kW-months/year
$(-25,830)
(-5,884)
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$22,135
Cost:
$42,000
$27,923 436,694 $2,377 870 $(-8,165) (-1,860) - - $27,923
436,694
kWh
$2,377
870
kW-months/year
$(-8,165)
(-1,860)
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,240
Cost:
$26,115
$6,240 97,597 - - - - - - $6,240
97,597
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$5,388
Cost:
$13,800
$4,966 77,667 $422 149 - - - - $4,966
77,667
kWh
$422
149
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$4,828
Cost:
$1,960
$2,755 43,083 - - $7,353 1,675 $(-5,280) - $2,755
43,083
kWh
-
-
kW-months/year
$7,353
1,675
MMBtu
$(-5,280)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,880
Cost:
$32,900
$4,498 70,340 $382 135 - - - - $4,498
70,340
kWh
$382
135
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,435
Cost:
$300
$2,435 45,721 - - - - - - $2,435
45,721
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,423
Cost:
$1,070
$1,423 22,274 - - - - - - $1,423
22,274
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$815
Cost:
$3,075
$750 11,723 $65 23 - - - - $750
11,723
kWh
$65
23
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$815
Cost:
$300
$750 11,723 $65 23 - - - - $750
11,723
kWh
$65
23
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$118,531
Cost:
$408,120
$139,951 2,196,365 $10,502 3,741 $(-26,642) (-6,069) $(-5,280) - $139,951
2,196,365
kWh
$10,502
3,741
kW-months/year
$(-26,642)
(-6,069)
MMBtu
$(-5,280)
-
$
TOTAL IMPLEMENTED Savings:
$19,769
Cost:
$50,330
$16,827 270,808 $869 307 $7,353 1,675 $(-5,280) - $16,827
270,808
kWh
$869
307
kW-months/year
$7,353
1,675
MMBtu
$(-5,280)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production