Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2000 |
Principal Product | PVC and Non-PVC Compounds |
NAICS | n/a |
SIC | 3087 - Custom Compound Purchased Resins |
Sales | $100,000,000-$500,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 91,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $717,786 | 10,814,478 | kWh | $0.07 |
Electricity Demand | $93,283 | 25,698 | kW-months/year | $3.63 |
Electricity Fees | $807 | - | $ | - |
LPG | $30,449 | 4,451 | MMBtu | $6.84 |
Fuel Oil #4 | $80,917 | 18,714 | MMBtu | $4.32 |
TOTAL ENERGY COSTS | $923,642 | |||
RECOMMENDED SAVINGS* | $28,415 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,099 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $15,467 Cost: $640 |
$13,917 | 111,079 | $1,550 | 427 | - | - | - | - |
$13,917 111,079 kWh |
$1,550 427 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $6,077 Cost: $4,000 |
$6,077 | 97,011 | - | - | - | - | - | - |
$6,077 97,011 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,974 Cost: $4,200 |
- | - | $294 | 81 | $2,680 | 143 | - | - |
- - kWh |
$294 81 kW-months/year |
$2,680 143 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2123 INSULATE FEEDWATER TANK |
Savings: $1,316 Cost: $800 |
- | - | - | - | $1,316 | 255 | - | - |
- - kWh |
- - kW-months/year |
$1,316 255 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,140 Cost: $1,500 |
- | - | - | - | $1,140 | 221 | - | - |
- - kWh |
- - kW-months/year |
$1,140 221 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $951 Cost: $500 |
- | - | - | - | $929 | 180 | $22 | 55 |
- - kWh |
- - kW-months/year |
$929 180 MMBtu |
$22 55 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2123 INSULATE FEEDWATER TANK |
Savings: $490 Cost: $1,100 |
- | - | - | - | $490 | 95 | - | - |
- - kWh |
- - kW-months/year |
$490 95 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,415 Cost: $12,740 |
$19,994 | 208,090 | $1,844 | 508 | $6,555 | 894 | $22 | 55 | $19,994 208,090 kWh |
$1,844 508 kW-months/year |
$6,555 894 MMBtu |
$22 55 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,099 Cost: $11,940 |
$19,994 | 208,090 | $1,844 | 508 | $5,239 | 639 | $22 | 55 | $19,994 208,090 kWh |
$1,844 508 kW-months/year |
$5,239 639 MMBtu |
$22 55 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) |