IAC logo
IAC Assessment: MA0467
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0467
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product PVC and Non-PVC Compounds
NAICS n/a
SIC 3087 - Custom Compound Purchased Resins
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 91,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $717,786 10,814,478 kWh $0.07
Electricity Demand $93,283 25,698 kW-months/year $3.63
Electricity Fees $807 - $ -
LPG $30,449 4,451 MMBtu $6.84
Fuel Oil #4 $80,917 18,714 MMBtu $4.32
TOTAL ENERGY COSTS $923,642
RECOMMENDED SAVINGS* $28,415 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,099
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,467
Cost:
$640
$13,917 111,079 $1,550 427 - - - - $13,917
111,079
kWh
$1,550
427
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$6,077
Cost:
$4,000
$6,077 97,011 - - - - - - $6,077
97,011
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,974
Cost:
$4,200
- - $294 81 $2,680 143 - - -
-
kWh
$294
81
kW-months/year
$2,680
143
MMBtu
-
-
lb
04: 2.2123 INSULATE FEEDWATER TANK Savings:
$1,316
Cost:
$800
- - - - $1,316 255 - - -
-
kWh
-
-
kW-months/year
$1,316
255
MMBtu
-
-
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,140
Cost:
$1,500
- - - - $1,140 221 - - -
-
kWh
-
-
kW-months/year
$1,140
221
MMBtu
-
-
lb
06: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$951
Cost:
$500
- - - - $929 180 $22 55 -
-
kWh
-
-
kW-months/year
$929
180
MMBtu
$22
55
lb
07: 2.2123 INSULATE FEEDWATER TANK Savings:
$490
Cost:
$1,100
- - - - $490 95 - - -
-
kWh
-
-
kW-months/year
$490
95
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$28,415
Cost:
$12,740
$19,994 208,090 $1,844 508 $6,555 894 $22 55 $19,994
208,090
kWh
$1,844
508
kW-months/year
$6,555
894
MMBtu
$22
55
lb
TOTAL IMPLEMENTED Savings:
$27,099
Cost:
$11,940
$19,994 208,090 $1,844 508 $5,239 639 $22 55 $19,994
208,090
kWh
$1,844
508
kW-months/year
$5,239
639
MMBtu
$22
55
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz)