IAC logo
IAC Assessment: MA0483
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0483
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Stainless steel legs, Utility cabinets, Grip plates
NAICS n/a
SIC 3429 - Hardware, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 337,000
Annual Production 462,000 Pieces
Production Hrs. Annual 2,210
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,012 1,628,760 kWh $0.06
Electricity Demand $93,043 6,798 kW-months/year $13.69
Electricity Fees $36,387 - $ -
Natural Gas $93,026 16,177 MMBtu $5.75
TOTAL ENERGY COSTS $337,857
RECOMMENDED SAVINGS* $20,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,920
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$8,700
Cost:
-
$(-900) (-20,300) $(-1,800) (-132) - - $6,475 2,893,800 $4,925 - $(-900)
(-20,300)
kWh
$(-1,800)
(-132)
kW-months/year
-
-
MMBtu
$6,475
2,893,800
Tgal
$4,925
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,400
Cost:
$14,000
$900 20,000 $2,500 192 - - - - - - $900
20,000
kWh
$2,500
192
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,200
Cost:
$11,000
$1,200 27,000 $2,000 149 - - - - - - $1,200
27,000
kWh
$2,000
149
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,250
Cost:
$12,000
- - - - $2,250 472 - - - - -
-
kWh
-
-
kW-months/year
$2,250
472
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,650
Cost:
$800
$1,650 36,500 - - - - - - - - $1,650
36,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,050
Cost:
$6,000
- - - - $1,050 220 - - - - -
-
kWh
-
-
kW-months/year
$1,050
220
MMBtu
-
-
Tgal
-
-
Tgal
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$570
Cost:
$2,500
- - - - $570 120 - - - - -
-
kWh
-
-
kW-months/year
$570
120
MMBtu
-
-
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$20,820
Cost:
$46,300
$2,850 63,200 $2,700 209 $3,870 812 $6,475 2,893,800 $4,925 - $2,850
63,200
kWh
$2,700
209
kW-months/year
$3,870
812
MMBtu
$6,475
2,893,800
Tgal
$4,925
-
Tgal
TOTAL IMPLEMENTED Savings:
$10,920
Cost:
$3,300
$750 16,200 $(-1,800) (-132) $570 120 $6,475 2,893,800 $4,925 - $750
16,200
kWh
$(-1,800)
(-132)
kW-months/year
$570
120
MMBtu
$6,475
2,893,800
Tgal
$4,925
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption