Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2001 |
Principal Product | Stainless steel legs, Utility cabinets, Grip plates |
NAICS | n/a |
SIC | 3429 - Hardware, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 337,000 |
Annual Production | 462,000 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $104,012 | 1,628,760 | kWh | $0.06 |
Electricity Demand | $93,043 | 6,798 | kW-months/year | $13.69 |
Electricity Fees | $36,387 | - | $ | - |
Natural Gas | $93,026 | 16,177 | MMBtu | $5.75 |
TOTAL ENERGY COSTS | $337,857 | |||
RECOMMENDED SAVINGS* | $20,820 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,920 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $8,700 Cost: - |
$(-900) | (-20,300) | $(-1,800) | (-132) | - | - | $6,475 | 2,893,800 | $4,925 | - |
$(-900) (-20,300) kWh |
$(-1,800) (-132) kW-months/year |
- - MMBtu |
$6,475 2,893,800 Tgal |
$4,925 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,400 Cost: $14,000 |
$900 | 20,000 | $2,500 | 192 | - | - | - | - | - | - |
$900 20,000 kWh |
$2,500 192 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,200 Cost: $11,000 |
$1,200 | 27,000 | $2,000 | 149 | - | - | - | - | - | - |
$1,200 27,000 kWh |
$2,000 149 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,250 Cost: $12,000 |
- | - | - | - | $2,250 | 472 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,250 472 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,650 Cost: $800 |
$1,650 | 36,500 | - | - | - | - | - | - | - | - |
$1,650 36,500 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $1,050 Cost: $6,000 |
- | - | - | - | $1,050 | 220 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,050 220 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $570 Cost: $2,500 |
- | - | - | - | $570 | 120 | - | - | - | - |
- - kWh |
- - kW-months/year |
$570 120 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,820 Cost: $46,300 |
$2,850 | 63,200 | $2,700 | 209 | $3,870 | 812 | $6,475 | 2,893,800 | $4,925 | - | $2,850 63,200 kWh |
$2,700 209 kW-months/year |
$3,870 812 MMBtu |
$6,475 2,893,800 Tgal |
$4,925 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,920 Cost: $3,300 |
$750 | 16,200 | $(-1,800) | (-132) | $570 | 120 | $6,475 | 2,893,800 | $4,925 | - | $750 16,200 kWh |
$(-1,800) (-132) kW-months/year |
$570 120 MMBtu |
$6,475 2,893,800 Tgal |
$4,925 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption |