Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2001 |
Principal Product | Technical Ceramics |
NAICS | n/a |
SIC | 3264 - Porcelain Electrical Supplies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 300,000 Pounds |
Production Hrs. Annual | 4,335 |
Location (State) | VT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $101,995 | 1,674,300 | kWh | $0.06 |
Electricity Demand | $66,639 | 4,534 | kW-months/year | $14.70 |
Electricity Fees | $4,559 | - | $ | - |
Natural Gas | $145,762 | 27,320 | MMBtu | $5.34 |
TOTAL ENERGY COSTS | $318,955 | |||
RECOMMENDED SAVINGS* | $180,940 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,700 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (haz) | Electricity Usage | Natural Gas | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $113,500 Cost: $270,000 |
- | - | $113,500 | 17,500 | - | - |
- - kWh |
$113,500 17,500 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $54,000 Cost: $40,000 |
- | - | - | - | $54,000 | 62,000 |
- - kWh |
- - MMBtu |
$54,000 62,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $9,700 Cost: $180 |
$9,700 | 161,700 | - | - | - | - |
$9,700 161,700 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $2,700 Cost: $2,000 |
$2,700 | 45,900 | - | - | - | - |
$2,700 45,900 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $870 Cost: $1,000 |
$870 | 14,500 | - | - | - | - |
$870 14,500 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $170 Cost: $120 |
- | - | $170 | 26 | - | - |
- - kWh |
$170 26 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $180,940 Cost: $313,300 |
$13,270 | 222,100 | $113,670 | 17,526 | $54,000 | 62,000 | $13,270 222,100 kWh |
$113,670 17,526 MMBtu |
$54,000 62,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,700 Cost: $180 |
$9,700 | 161,700 | - | - | - | - | $9,700 161,700 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||