IAC logo
IAC Assessment: MA0494
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Easter White Pine Boards
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 69
Plant Area (Sq.Ft.) 3,600,000
Annual Production 13,000 Thousand Feet
Production Hrs. Annual 2,730
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $339,786 3,867,789 kWh $0.09
Electricity Demand $22,364 11,695 kW-months/year $1.91
Electricity Fees $10,979 - $ -
Fuel Oil #2 $237,842 35,332 MMBtu $6.73
TOTAL ENERGY COSTS $610,971
RECOMMENDED SAVINGS* $116,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,447
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #2 Administrative Changes Electricity Usage LPG Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,732
Cost:
$5,000
$46,732 549,794 - - - - - - $46,732
549,794
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$29,014
Cost:
$200,000
- - - - $29,014 5,363 - - -
-
kWh
-
-
MMBtu
$29,014
5,363
MMBtu
-
-
$
03: 2.4311 RECOVER MECHANICAL ENERGY Savings:
$18,000
Cost:
$80,000
$8,000 94,118 - - - - $10,000 - $8,000
94,118
kWh
-
-
MMBtu
-
-
MMBtu
$10,000
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,346
Cost:
$19,000
$9,346 109,958 - - - - - - $9,346
109,958
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$6,536
Cost:
$24,000
- - $6,536 475 - - - - -
-
kWh
$6,536
475
MMBtu
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,263
Cost:
$13,000
- - - - $5,263 730 - - -
-
kWh
-
-
MMBtu
$5,263
730
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$610
Cost:
$2,700
$610 7,175 - - - - - - $610
7,175
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$476
Cost:
$500
- - - - $476 88 - - -
-
kWh
-
-
MMBtu
$476
88
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$759
Cost:
-
$759 8,930 - - - - - - $759
8,930
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$116,736
Cost:
$344,200
$65,447 769,975 $6,536 475 $34,753 6,181 $10,000 - $65,447
769,975
kWh
$6,536
475
MMBtu
$34,753
6,181
MMBtu
$10,000
-
$
TOTAL IMPLEMENTED Savings:
$57,447
Cost:
$26,700
$57,447 675,857 - - - - - - $57,447
675,857
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage LPG Fuel Oil #2 Administrative Changes Electricity Usage LPG Fuel Oil #2 Administrative Changes