Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2001 |
Principal Product | Easter White Pine Boards |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $5,000,000-$10,000,000 |
# of Employees | 69 |
Plant Area (Sq.Ft.) | 3,600,000 |
Annual Production | 13,000 Thousand Feet |
Production Hrs. Annual | 2,730 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $339,786 | 3,867,789 | kWh | $0.09 |
Electricity Demand | $22,364 | 11,695 | kW-months/year | $1.91 |
Electricity Fees | $10,979 | - | $ | - |
Fuel Oil #2 | $237,842 | 35,332 | MMBtu | $6.73 |
TOTAL ENERGY COSTS | $610,971 | |||
RECOMMENDED SAVINGS* | $116,736 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $57,447 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #2 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $46,732 Cost: $5,000 |
$46,732 | 549,794 | - | - | - | - | - | - |
$46,732 549,794 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $29,014 Cost: $200,000 |
- | - | - | - | $29,014 | 5,363 | - | - |
- - kWh |
- - MMBtu |
$29,014 5,363 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4311 RECOVER MECHANICAL ENERGY |
Savings: $18,000 Cost: $80,000 |
$8,000 | 94,118 | - | - | - | - | $10,000 | - |
$8,000 94,118 kWh |
- - MMBtu |
- - MMBtu |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,346 Cost: $19,000 |
$9,346 | 109,958 | - | - | - | - | - | - |
$9,346 109,958 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $6,536 Cost: $24,000 |
- | - | $6,536 | 475 | - | - | - | - |
- - kWh |
$6,536 475 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $5,263 Cost: $13,000 |
- | - | - | - | $5,263 | 730 | - | - |
- - kWh |
- - MMBtu |
$5,263 730 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $610 Cost: $2,700 |
$610 | 7,175 | - | - | - | - | - | - |
$610 7,175 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $476 Cost: $500 |
- | - | - | - | $476 | 88 | - | - |
- - kWh |
- - MMBtu |
$476 88 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $759 Cost: - |
$759 | 8,930 | - | - | - | - | - | - |
$759 8,930 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $116,736 Cost: $344,200 |
$65,447 | 769,975 | $6,536 | 475 | $34,753 | 6,181 | $10,000 | - | $65,447 769,975 kWh |
$6,536 475 MMBtu |
$34,753 6,181 MMBtu |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $57,447 Cost: $26,700 |
$57,447 | 675,857 | - | - | - | - | - | - | $57,447 675,857 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #2 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #2 | Administrative Changes |