IAC Assessment: MA0498
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0498
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Stainless steel and high alloy castings
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 110,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 4,420
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $658,691 9,355,508 kWh $0.07
Electricity Fees $600 - $ -
Natural Gas $151,468 36,456 MMBtu $4.15
TOTAL ENERGY COSTS $810,759
RECOMMENDED SAVINGS* $64,949 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,351
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,844
Cost:
$60,000
$35,844 512,054 - - $35,844
512,054
kWh
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$10,867
Cost:
-
$10,867 155,250 - - $10,867
155,250
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,790
Cost:
$35,000
$7,790 111,285 - - $7,790
111,285
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,980
Cost:
-
$3,980 56,848 - - $3,980
56,848
kWh
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,300
Cost:
$13,000
$4,364 62,352 $(-1,064) (-266) $4,364
62,352
kWh
$(-1,064)
(-266)
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,132
Cost:
$25,540
$2,132 30,445 - - $2,132
30,445
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$808
Cost:
$2,000
$808 11,541 - - $808
11,541
kWh
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$228
Cost:
$45
$228 3,264 - - $228
3,264
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,949
Cost:
$135,585
$66,013 943,039 $(-1,064) (-266) $66,013
943,039
kWh
$(-1,064)
(-266)
MMBtu
TOTAL IMPLEMENTED Savings:
$56,351
Cost:
$98,585
$57,415 820,213 $(-1,064) (-266) $57,415
820,213
kWh
$(-1,064)
(-266)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas