IAC logo
IAC Assessment: MA0503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Abrasive stones
NAICS n/a
SIC 3291 - Abrasive Products
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 90,000
Annual Production 1,225,000 Pounds
Production Hrs. Annual 8,450
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $195,791 3,618,000 kWh $0.05
Electricity Demand $80,079 9,076 kW-months/year $8.82
Electricity Fees $1,482 - $ -
Fuel Oil #4 $59,137 9,360 MMBtu $6.32
TOTAL ENERGY COSTS $362,595
RECOMMENDED SAVINGS* $81,493 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $965
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #4 Electricity Usage Electricity Demand LPG Fuel Oil #4
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$46,957
Cost:
$57,500
$78,325 1,442,442 $17,872 2,015 $(-49,240) (-6,155) - - $78,325
1,442,442
kWh
$17,872
2,015
kW-months/year
$(-49,240)
(-6,155)
MMBtu
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,668
Cost:
$14,000
- - - - - - $5,668 1,042 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,668
1,042
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$12,833
Cost:
$13,000
- - - - - - $12,833 2,359 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,833
2,359
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,423
Cost:
$7,500
$4,546 9,486 - - - - $7,877 1,448 $4,546
9,486
kWh
-
-
kW-months/year
-
-
MMBtu
$7,877
1,448
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,038
Cost:
$10,000
$2,790 51,383 - - $(-1,752) (-219) - - $2,790
51,383
kWh
-
-
kW-months/year
$(-1,752)
(-219)
MMBtu
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$911
Cost:
$6,000
$2,447 45,068 - - $(-1,536) (-192) - - $2,447
45,068
kWh
-
-
kW-months/year
$(-1,536)
(-192)
MMBtu
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$698
Cost:
$12,180
$531 9,772 $167 19 - - - - $531
9,772
kWh
$167
19
kW-months/year
-
-
MMBtu
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$508
Cost:
$300
$508 9,353 - - - - - - $508
9,353
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$457
Cost:
$500
- - - - - - $457 84 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$457
84
MMBtu
TOTAL RECOMMENDED Savings:
$81,493
Cost:
$120,980
$89,147 1,567,504 $18,039 2,034 $(-52,528) (-6,566) $26,835 4,933 $89,147
1,567,504
kWh
$18,039
2,034
kW-months/year
$(-52,528)
(-6,566)
MMBtu
$26,835
4,933
MMBtu
TOTAL IMPLEMENTED Savings:
$965
Cost:
$800
$508 9,353 - - - - $457 84 $508
9,353
kWh
-
-
kW-months/year
-
-
MMBtu
$457
84
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand LPG Fuel Oil #4 Electricity Usage Electricity Demand LPG Fuel Oil #4