IAC logo
IAC Assessment: MA0506
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0506
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Thermoplastic Polyurethane Film and Sheet
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 78
Plant Area (Sq.Ft.) 107,000
Annual Production 7,200,000 Pounds
Production Hrs. Annual 6,120
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $254,930 6,151,680 kWh $0.04
Electricity Demand $210,526 13,478 kW-months/year $15.62
Electricity Fees $55,297 - $ -
Natural Gas $76,893 7,996 MMBtu $9.62
TOTAL ENERGY COSTS $597,646
RECOMMENDED SAVINGS* $26,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,216
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,554
Cost:
$9,225
$6,699 158,627 $4,855 311 - - $6,699
158,627
kWh
$4,855
311
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,604
Cost:
$13,500
$5,659 133,995 $4,123 264 $(-4,178) (-570) $5,659
133,995
kWh
$4,123
264
kW-months/year
$(-4,178)
(-570)
MMBtu
03: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$3,778
Cost:
-
$2,341 19,696 - - $1,437 196 $2,341
19,696
kWh
-
-
kW-months/year
$1,437
196
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,391
Cost:
$1,102
$1,966 46,512 $1,425 91 - - $1,966
46,512
kWh
$1,425
91
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,289
Cost:
$1,100
$747 17,687 $542 35 - - $747
17,687
kWh
$542
35
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$982
Cost:
$3,275
$982 23,256 - - - - $982
23,256
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,598
Cost:
$28,202
$18,394 399,773 $10,945 701 $(-2,741) (-374) $18,394
399,773
kWh
$10,945
701
kW-months/year
$(-2,741)
(-374)
MMBtu
TOTAL IMPLEMENTED Savings:
$17,216
Cost:
$14,702
$10,394 246,082 $6,822 437 - - $10,394
246,082
kWh
$6,822
437
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas