IAC Assessment: MA0510
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0510
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Specialty Papers and boards
NAICS n/a
SIC 2631 - Paperboard Mills
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 52,000
Annual Production 1,400,000 Pounds
Production Hrs. Annual 6,240
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,408 2,062,200 kWh $0.08
Electricity Demand $54,840 8,272 kW-months/year $6.63
Electricity Fees $1,260 - $ -
Natural Gas $56,442 5,690 MMBtu $9.92
Fuel Oil #6 $119,800 22,468 MMBtu $5.33
TOTAL ENERGY COSTS $393,750
RECOMMENDED SAVINGS* $32,858 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,164
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS Savings:
$16,518
Cost:
$13,775
- - $14,496 2,154 $2,022 512 - - -
-
kWh
$14,496
2,154
MMBtu
$2,022
512
MMBtu
-
-
$
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$5,976
Cost:
$7,800
- - $5,976 888 - - - - -
-
kWh
$5,976
888
MMBtu
-
-
MMBtu
-
-
$
03: 2.8112 COMBINE UTILITY METERS Savings:
$2,200
Cost:
$6,470
- - - - - - $2,200 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$2,200
-
$
04: 2.5123 REDUCE FLUID FLOW RATES Savings:
$1,849
Cost:
-
$1,849 23,705 - - - - - - $1,849
23,705
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,619
Cost:
-
$1,619 20,757 - - - - - - $1,619
20,757
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,604
Cost:
$1,792
- - - - $1,604 427 - - -
-
kWh
-
-
MMBtu
$1,604
427
MMBtu
-
-
$
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,382
Cost:
-
- - - - $1,382 350 - - -
-
kWh
-
-
MMBtu
$1,382
350
MMBtu
-
-
$
08: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$960
Cost:
-
- - - - $960 243 - - -
-
kWh
-
-
MMBtu
$960
243
MMBtu
-
-
$
09: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$750
Cost:
-
- - - - $750 190 - - -
-
kWh
-
-
MMBtu
$750
190
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,858
Cost:
$29,837
$3,468 44,462 $20,472 3,042 $6,718 1,722 $2,200 - $3,468
44,462
kWh
$20,472
3,042
MMBtu
$6,718
1,722
MMBtu
$2,200
-
$
TOTAL IMPLEMENTED Savings:
$8,164
Cost:
$1,792
$3,468 44,462 - - $4,696 1,210 - - $3,468
44,462
kWh
-
-
MMBtu
$4,696
1,210
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes