IAC Assessment: MA0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Flock fiber
NAICS n/a
SIC 2261 - Finishing Plants, Cotton
Sales $10,000,000-$50,000,000
# of Employees 88
Plant Area (Sq.Ft.) 75,000
Annual Production 9,000,000 Pounds
Production Hrs. Annual 5,400
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,557 2,531,400 kWh $0.08
Electricity Fees $33,593 - $ -
Natural Gas $444,007 64,197 MMBtu $6.92
TOTAL ENERGY COSTS $686,157
RECOMMENDED SAVINGS* $226,009 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $165,008
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$151,365
Cost:
$135,000
$(-2,556) (-33,570) $(-341) (-67) $154,262 24,801 - - $(-2,556)
(-33,570)
kWh
$(-341)
(-67)
kW-months/year
$154,262
24,801
MMBtu
-
-
Tgal
02: 3.4151 MINIMIZE WATER USAGE Savings:
$43,582
Cost:
$43,100
$(-232) (-3,040) $(-911) (-179) $21,440 3,447 $23,285 - $(-232)
(-3,040)
kWh
$(-911)
(-179)
kW-months/year
$21,440
3,447
MMBtu
$23,285
-
Tgal
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$14,155
Cost:
$19,000
$(-3,384) (-50,355) $(-916) (-180) $18,455 2,967 - - $(-3,384)
(-50,355)
kWh
$(-916)
(-180)
kW-months/year
$18,455
2,967
MMBtu
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,343
Cost:
$8,400
- - - - $5,343 859 - - -
-
kWh
-
-
kW-months/year
$5,343
859
MMBtu
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,745
Cost:
$460
$3,745 49,191 - - - - - - $3,745
49,191
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,589
Cost:
$5,200
$3,589 47,144 - - - - - - $3,589
47,144
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$966
Cost:
$625
$966 12,682 - - - - - - $966
12,682
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$560
Cost:
-
- - - - $560 90 - - -
-
kWh
-
-
kW-months/year
$560
90
MMBtu
-
-
Tgal
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,704
Cost:
$15,768
$2,704 35,520 - - - - - - $2,704
35,520
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$226,009
Cost:
$227,553
$4,832 57,572 $(-2,168) (-426) $200,060 32,164 $23,285 - $4,832
57,572
kWh
$(-2,168)
(-426)
kW-months/year
$200,060
32,164
MMBtu
$23,285
-
Tgal
TOTAL IMPLEMENTED Savings:
$165,008
Cost:
$149,685
$5,744 75,447 $(-341) (-67) $159,605 25,660 - - $5,744
75,447
kWh
$(-341)
(-67)
kW-months/year
$159,605
25,660
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption