Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2002 |
Principal Product | Flock fiber |
NAICS | n/a |
SIC | 2261 - Finishing Plants, Cotton |
Sales | $10,000,000-$50,000,000 |
# of Employees | 88 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 9,000,000 Pounds |
Production Hrs. Annual | 5,400 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $208,557 | 2,531,400 | kWh | $0.08 |
Electricity Fees | $33,593 | - | $ | - |
Natural Gas | $444,007 | 64,197 | MMBtu | $6.92 |
TOTAL ENERGY COSTS | $686,157 | |||
RECOMMENDED SAVINGS* | $226,009 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $165,008 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $151,365 Cost: $135,000 |
$(-2,556) | (-33,570) | $(-341) | (-67) | $154,262 | 24,801 | - | - |
$(-2,556) (-33,570) kWh |
$(-341) (-67) kW-months/year |
$154,262 24,801 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4151 MINIMIZE WATER USAGE |
Savings: $43,582 Cost: $43,100 |
$(-232) | (-3,040) | $(-911) | (-179) | $21,440 | 3,447 | $23,285 | - |
$(-232) (-3,040) kWh |
$(-911) (-179) kW-months/year |
$21,440 3,447 MMBtu |
$23,285 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $14,155 Cost: $19,000 |
$(-3,384) | (-50,355) | $(-916) | (-180) | $18,455 | 2,967 | - | - |
$(-3,384) (-50,355) kWh |
$(-916) (-180) kW-months/year |
$18,455 2,967 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,343 Cost: $8,400 |
- | - | - | - | $5,343 | 859 | - | - |
- - kWh |
- - kW-months/year |
$5,343 859 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,745 Cost: $460 |
$3,745 | 49,191 | - | - | - | - | - | - |
$3,745 49,191 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,589 Cost: $5,200 |
$3,589 | 47,144 | - | - | - | - | - | - |
$3,589 47,144 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $966 Cost: $625 |
$966 | 12,682 | - | - | - | - | - | - |
$966 12,682 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $560 Cost: - |
- | - | - | - | $560 | 90 | - | - |
- - kWh |
- - kW-months/year |
$560 90 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,704 Cost: $15,768 |
$2,704 | 35,520 | - | - | - | - | - | - |
$2,704 35,520 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $226,009 Cost: $227,553 |
$4,832 | 57,572 | $(-2,168) | (-426) | $200,060 | 32,164 | $23,285 | - | $4,832 57,572 kWh |
$(-2,168) (-426) kW-months/year |
$200,060 32,164 MMBtu |
$23,285 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $165,008 Cost: $149,685 |
$5,744 | 75,447 | $(-341) | (-67) | $159,605 | 25,660 | - | - | $5,744 75,447 kWh |
$(-341) (-67) kW-months/year |
$159,605 25,660 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption |