Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2002 |
Principal Product | Teflon and metal hose products |
NAICS | n/a |
SIC | 3052 - Rubber & Plastics Hose & Belting |
Sales | $100,000,000-$500,000,000 |
# of Employees | 545 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 15,500,000 Pounds |
Production Hrs. Annual | 6,552 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $680,219 | 14,199,135 | kWh | $0.05 |
Electricity Demand | $354,580 | 26,202 | kW-months/year | $13.53 |
Electricity Fees | $174,113 | - | $ | - |
Natural Gas | $210,373 | 32,079 | MMBtu | $6.56 |
Fuel Oil #2 | $11,794 | 1,496 | MMBtu | $7.88 |
Fuel Oil #4 | $138,878 | 27,933 | MMBtu | $4.97 |
TOTAL ENERGY COSTS | $1,569,957 | |||
RECOMMENDED SAVINGS* | $66,265 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $54,568 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Fuel Oil #4 | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2514 COVER OPEN TANKS |
Savings: $30,107 Cost: $4,262 |
- | - | $30,107 | 3,702 | - | - | - | - |
- - kWh |
$30,107 3,702 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $11,697 Cost: $33,800 |
$21,174 | 428,062 | - | - | $(-9,477) | (-2,149) | - | - |
$21,174 428,062 kWh |
- - MMBtu |
$(-9,477) (-2,149) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2212 USE MINIMUM SAFE OVEN VENTILATION |
Savings: $7,427 Cost: $2,100 |
$7,095 | 147,325 | - | - | $332 | 71 | - | - |
$7,095 147,325 kWh |
- - MMBtu |
$332 71 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $6,528 Cost: - |
- | - | - | - | - | - | $6,528 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$6,528 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,349 Cost: $9,636 |
- | - | $6,349 | 779 | - | - | - | - |
- - kWh |
$6,349 779 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,140 Cost: $5,200 |
$2,140 | 43,274 | - | - | - | - | - | - |
$2,140 43,274 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,164 Cost: $2,500 |
$1,164 | 28,151 | - | - | - | - | - | - |
$1,164 28,151 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $853 Cost: $1,515 |
$853 | 19,691 | - | - | - | - | - | - |
$853 19,691 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $66,265 Cost: $59,013 |
$32,426 | 666,503 | $36,456 | 4,481 | $(-9,145) | (-2,078) | $6,528 | - | $32,426 666,503 kWh |
$36,456 4,481 MMBtu |
$(-9,145) (-2,078) MMBtu |
$6,528 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $54,568 Cost: $25,213 |
$11,252 | 238,441 | $36,456 | 4,481 | $332 | 71 | $6,528 | - | $11,252 238,441 kWh |
$36,456 4,481 MMBtu |
$332 71 MMBtu |
$6,528 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #4 | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Fuel Oil #4 | One-time Revenue or Avoided Cost |