IAC Assessment: MA0517
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0517
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Teflon and metal hose products
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $100,000,000-$500,000,000
# of Employees 545
Plant Area (Sq.Ft.) 250,000
Annual Production 15,500,000 Pounds
Production Hrs. Annual 6,552
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $680,219 14,199,135 kWh $0.05
Electricity Demand $354,580 26,202 kW-months/year $13.53
Electricity Fees $174,113 - $ -
Natural Gas $210,373 32,079 MMBtu $6.56
Fuel Oil #2 $11,794 1,496 MMBtu $7.88
Fuel Oil #4 $138,878 27,933 MMBtu $4.97
TOTAL ENERGY COSTS $1,569,957
RECOMMENDED SAVINGS* $66,265 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,568
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 One-time Revenue or Avoided Cost Electricity Usage Natural Gas Fuel Oil #4 One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2514 COVER OPEN TANKS Savings:
$30,107
Cost:
$4,262
- - $30,107 3,702 - - - - -
-
kWh
$30,107
3,702
MMBtu
-
-
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$11,697
Cost:
$33,800
$21,174 428,062 - - $(-9,477) (-2,149) - - $21,174
428,062
kWh
-
-
MMBtu
$(-9,477)
(-2,149)
MMBtu
-
-
$
03: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$7,427
Cost:
$2,100
$7,095 147,325 - - $332 71 - - $7,095
147,325
kWh
-
-
MMBtu
$332
71
MMBtu
-
-
$
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$6,528
Cost:
-
- - - - - - $6,528 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$6,528
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,349
Cost:
$9,636
- - $6,349 779 - - - - -
-
kWh
$6,349
779
MMBtu
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,140
Cost:
$5,200
$2,140 43,274 - - - - - - $2,140
43,274
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,164
Cost:
$2,500
$1,164 28,151 - - - - - - $1,164
28,151
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$853
Cost:
$1,515
$853 19,691 - - - - - - $853
19,691
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$66,265
Cost:
$59,013
$32,426 666,503 $36,456 4,481 $(-9,145) (-2,078) $6,528 - $32,426
666,503
kWh
$36,456
4,481
MMBtu
$(-9,145)
(-2,078)
MMBtu
$6,528
-
$
TOTAL IMPLEMENTED Savings:
$54,568
Cost:
$25,213
$11,252 238,441 $36,456 4,481 $332 71 $6,528 - $11,252
238,441
kWh
$36,456
4,481
MMBtu
$332
71
MMBtu
$6,528
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #4 One-time Revenue or Avoided Cost Electricity Usage Natural Gas Fuel Oil #4 One-time Revenue or Avoided Cost