Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Pump and engine control systems
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 408
Plant Area (Sq.Ft.) 240,000
Annual Production 350 Pieces
Production Hrs. Annual 4,810
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $432,265 8,220,351 kWh $0.05
Electricity Demand $163,846 18,246 kW-months/year $8.98
Electricity Fees $9,447 - $ -
Natural Gas $117,164 18,042 MMBtu $6.49
Fuel Oil #2 $202,699 19,925 MMBtu $10.17
TOTAL ENERGY COSTS $925,421
RECOMMENDED SAVINGS* $54,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,584
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,771
Cost:
$13,775
$12,602 227,476 - - $4,976 876 $11,193 1,210 $12,602
227,476
kWh
-
-
kW-months/year
$4,976
876
MMBtu
$11,193
1,210
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$17,181
Cost:
$2,500
- - $17,181 1,764 - - - - -
-
kWh
$17,181
1,764
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,294
Cost:
$6,675
$6,294 113,616 - - - - - - $6,294
113,616
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,344
Cost:
$450
$1,344 24,260 - - - - - - $1,344
24,260
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,240
Cost:
$500
$1,240 22,464 - - - - - - $1,240
22,464
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$54,830
Cost:
$23,900
$21,480 387,816 $17,181 1,764 $4,976 876 $11,193 1,210 $21,480
387,816
kWh
$17,181
1,764
kW-months/year
$4,976
876
MMBtu
$11,193
1,210
MMBtu
TOTAL IMPLEMENTED Savings:
$2,584
Cost:
$950
$2,584 46,724 - - - - - - $2,584
46,724
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2