IAC Assessment: MA0522
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0522
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Corrugated paper
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 250,000
Annual Production 36,000 Tons
Production Hrs. Annual 8,568
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,393,058 20,056,800 kWh $0.07
Electricity Demand $169,356 35,327 kW-months/year $4.79
Electricity Fees $(-540) - $ -
Natural Gas $1,086,548 232,103 MMBtu $4.68
TOTAL ENERGY COSTS $2,701,110
RECOMMENDED SAVINGS* $1,161,166 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,709
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 3.4151 MINIMIZE WATER USAGE Savings:
$32,733
Cost:
$25,000
$2,240 31,959 - - $17,778 3,643 $12,715 4,915,600 $2,240
31,959
kWh
-
-
kW-months/year
$17,778
3,643
MMBtu
$12,715
4,915,600
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$161,660
Cost:
$225,500
- - - - $161,660 33,127 - - -
-
kWh
-
-
kW-months/year
$161,660
33,127
MMBtu
-
-
Tgal
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$59,990
Cost:
$26,000
- - - - $59,990 12,293 - - -
-
kWh
-
-
kW-months/year
$59,990
12,293
MMBtu
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,884
Cost:
$20,000
$23,884 340,837 - - - - - - $23,884
340,837
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$19,687
Cost:
$55,000
$(-26,874) 340,837 - - - - $46,561 16,664,079 $(-26,874)
340,837
kWh
-
-
kW-months/year
-
-
MMBtu
$46,561
16,664,079
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,163
Cost:
$23,000
$5,628 80,307 $535 112 - - - - $5,628
80,307
kWh
$535
112
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$3,709
Cost:
$1,000
- - - - $3,709 760 - - -
-
kWh
-
-
kW-months/year
$3,709
760
MMBtu
-
-
Tgal
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,677
Cost:
$9,000
$2,443 34,869 $234 49 - - - - $2,443
34,869
kWh
$234
49
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$850,663
Cost:
$3,285,330
$979,003 19,674,300 - - $(-128,340) (-80,903) - - $979,003
19,674,300
kWh
-
-
kW-months/year
$(-128,340)
(-80,903)
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$1,161,166
Cost:
$3,669,830
$986,324 20,503,109 $769 161 $114,797 (-31,080) $59,276 21,579,679 $986,324
20,503,109
kWh
$769
161
kW-months/year
$114,797
(-31,080)
MMBtu
$59,276
21,579,679
Tgal
TOTAL IMPLEMENTED Savings:
$3,709
Cost:
$1,000
- - - - $3,709 760 - - -
-
kWh
-
-
kW-months/year
$3,709
760
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal