IAC Assessment: MA0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Custom Injection molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 50,000
Annual Production 0 Units
Production Hrs. Annual 4,080
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,750 1,629,000 kWh $0.10
Electricity Demand $29,532 5,028 kW-months/year $5.87
Electricity Fees $(-2,515) - $ -
Natural Gas $14,282 1,445 MMBtu $9.88
TOTAL ENERGY COSTS $202,049
RECOMMENDED SAVINGS* $27,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,351
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal $ $
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$14,262
Cost:
$23,900
$(-1,440) (-15,218) $(-407) (-60) - - - - $16,609 - $(-500) - $(-1,440)
(-15,218)
kWh
$(-407)
(-60)
kW-months/year
-
-
MMBtu
-
-
$
$16,609
-
Tgal
$(-500)
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,907
Cost:
$11,770
- - $6,907 1,019 - - - - - - - - -
-
kWh
$6,907
1,019
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,108
Cost:
-
$132 1,397 - - $1,976 235 - - - - - - $132
1,397
kWh
-
-
kW-months/year
$1,976
235
MMBtu
-
-
$
-
-
Tgal
-
-
$
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,510
Cost:
-
- - - - - - $1,510 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,510
-
$
-
-
Tgal
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,423
Cost:
$2,200
$858 6,446 - - $565 102 - - - - - - $858
6,446
kWh
-
-
kW-months/year
$565
102
MMBtu
-
-
$
-
-
Tgal
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$467
Cost:
$250
$467 4,940 - - - - - - - - - - $467
4,940
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$359
Cost:
$230
$316 3,339 $43 7 - - - - - - - - $316
3,339
kWh
$43
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$308
Cost:
-
$308 2,238 - - - - - - - - - - $308
2,238
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$27,344
Cost:
$38,350
$641 3,142 $6,543 966 $2,541 337 $1,510 - $16,609 - $(-500) - $641
3,142
kWh
$6,543
966
kW-months/year
$2,541
337
MMBtu
$1,510
-
$
$16,609
-
Tgal
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$11,351
Cost:
$12,250
$915 9,676 $6,950 1,026 $1,976 235 $1,510 - - - - - $915
9,676
kWh
$6,950
1,026
kW-months/year
$1,976
235
MMBtu
$1,510
-
$
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption One-time Revenue or Avoided Cost