Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2002 |
Principal Product | Abrasive Grinding wheels |
NAICS | n/a |
SIC | 3291 - Abrasive Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 62,000 |
Annual Production | 130,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $499,717 | 7,676,160 | kWh | $0.07 |
Electricity Demand | $164,468 | 28,114 | kW-months/year | $5.85 |
Natural Gas | $275,845 | 45,453 | MMBtu | $6.07 |
Other Energy | $210,698 | 42,498 | MMBtu | $4.96 |
TOTAL ENERGY COSTS | $1,150,728 | |||
RECOMMENDED SAVINGS* | $62,044 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,797 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Energy | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Other Energy | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $31,997 Cost: - |
$(-15,515) | (-254,600) | $(-2,833) | (-484) | $41,085 | 8,300 | - | - | $9,260 | - |
$(-15,515) (-254,600) kWh |
$(-2,833) (-484) kW-months/year |
$41,085 8,300 MMBtu |
- - $ |
$9,260 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $14,755 Cost: $45,000 |
$(-8,512) | (-139,651) | - | - | - | - | $23,267 | - | - | - |
$(-8,512) (-139,651) kWh |
- - kW-months/year |
- - MMBtu |
$23,267 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,776 Cost: $16,000 |
$5,729 | 93,996 | $1,047 | 179 | - | - | - | - | - | - |
$5,729 93,996 kWh |
$1,047 179 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $3,719 Cost: $13,000 |
$3,140 | 51,521 | $579 | 99 | - | - | - | - | - | - |
$3,140 51,521 kWh |
$579 99 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $4,117 Cost: $2,000 |
$4,117 | 70,122 | - | - | - | - | - | - | - | - |
$4,117 70,122 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $501 Cost: $158 |
- | - | - | - | $501 | 101 | - | - | - | - |
- - kWh |
- - kW-months/year |
$501 101 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $179 Cost: $750 |
- | - | - | - | $179 | 36 | - | - | - | - |
- - kWh |
- - kW-months/year |
$179 36 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,044 Cost: $76,908 |
$(-11,041) | (-178,612) | $(-1,207) | (-206) | $41,765 | 8,437 | $23,267 | - | $9,260 | - | $(-11,041) (-178,612) kWh |
$(-1,207) (-206) kW-months/year |
$41,765 8,437 MMBtu |
$23,267 - $ |
$9,260 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,797 Cost: $2,908 |
$4,117 | 70,122 | - | - | $680 | 137 | - | - | - | - | $4,117 70,122 kWh |
- - kW-months/year |
$680 137 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Energy | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Other Energy | Ancillary Material Cost | Water Consumption |