IAC logo
IAC Assessment: MA0524
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0524
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Abrasive Grinding wheels
NAICS n/a
SIC 3291 - Abrasive Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 62,000
Annual Production 130,000 Pieces
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $499,717 7,676,160 kWh $0.07
Electricity Demand $164,468 28,114 kW-months/year $5.85
Natural Gas $275,845 45,453 MMBtu $6.07
Other Energy $210,698 42,498 MMBtu $4.96
TOTAL ENERGY COSTS $1,150,728
RECOMMENDED SAVINGS* $62,044 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,797
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Energy Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Other Energy Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$31,997
Cost:
-
$(-15,515) (-254,600) $(-2,833) (-484) $41,085 8,300 - - $9,260 - $(-15,515)
(-254,600)
kWh
$(-2,833)
(-484)
kW-months/year
$41,085
8,300
MMBtu
-
-
$
$9,260
-
Tgal
02: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$14,755
Cost:
$45,000
$(-8,512) (-139,651) - - - - $23,267 - - - $(-8,512)
(-139,651)
kWh
-
-
kW-months/year
-
-
MMBtu
$23,267
-
$
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,776
Cost:
$16,000
$5,729 93,996 $1,047 179 - - - - - - $5,729
93,996
kWh
$1,047
179
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$3,719
Cost:
$13,000
$3,140 51,521 $579 99 - - - - - - $3,140
51,521
kWh
$579
99
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,117
Cost:
$2,000
$4,117 70,122 - - - - - - - - $4,117
70,122
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$501
Cost:
$158
- - - - $501 101 - - - - -
-
kWh
-
-
kW-months/year
$501
101
MMBtu
-
-
$
-
-
Tgal
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$179
Cost:
$750
- - - - $179 36 - - - - -
-
kWh
-
-
kW-months/year
$179
36
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$62,044
Cost:
$76,908
$(-11,041) (-178,612) $(-1,207) (-206) $41,765 8,437 $23,267 - $9,260 - $(-11,041)
(-178,612)
kWh
$(-1,207)
(-206)
kW-months/year
$41,765
8,437
MMBtu
$23,267
-
$
$9,260
-
Tgal
TOTAL IMPLEMENTED Savings:
$4,797
Cost:
$2,908
$4,117 70,122 - - $680 137 - - - - $4,117
70,122
kWh
-
-
kW-months/year
$680
137
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Other Energy Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Other Energy Ancillary Material Cost Water Consumption