IAC logo
IAC Assessment: MA0527
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0527
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2003
Principal Product Plastic trays
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 192
Plant Area (Sq.Ft.) 110,000
Annual Production 8,000,000 Pieces
Production Hrs. Annual 6,656
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,443 4,642,200 kWh $0.07
Electricity Demand $106,897 11,821 kW-months/year $9.04
Electricity Fees $(-2,235) - $ -
Natural Gas $9,850 1,229 MMBtu $8.01
TOTAL ENERGY COSTS $443,144
RECOMMENDED SAVINGS* $51,123 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$27,223
Cost:
$224,940
$30,769 439,562 $7,239 792 $(-10,785) (-1,667) $30,769
439,562
kWh
$7,239
792
kW-months/year
$(-10,785)
(-1,667)
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,470
Cost:
$16,940
$8,470 121,001 - - - - $8,470
121,001
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,813
Cost:
$23,660
$5,228 74,685 $585 64 - - $5,228
74,685
kWh
$585
64
kW-months/year
-
-
MMBtu
04: 2.1117 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION Savings:
$3,067
Cost:
$150
$3,067 43,813 - - - - $3,067
43,813
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,224
Cost:
$2,070
$2,224 31,777 - - - - $2,224
31,777
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,543
Cost:
-
$1,251 17,875 $292 32 - - $1,251
17,875
kWh
$292
32
kW-months/year
-
-
MMBtu
07: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$1,300
Cost:
-
$1,300 18,577 - - - - $1,300
18,577
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$869
Cost:
-
$869 12,413 - - - - $869
12,413
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$477
Cost:
$500
$775 11,074 - - $(-298) (-46) $775
11,074
kWh
-
-
kW-months/year
$(-298)
(-46)
MMBtu
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$137
Cost:
-
$137 1,955 - - - - $137
1,955
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$51,123
Cost:
$268,260
$54,090 772,732 $8,116 888 $(-11,083) (-1,713) $54,090
772,732
kWh
$8,116
888
kW-months/year
$(-11,083)
(-1,713)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu