Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2003 |
Principal Product | Tissue paper |
NAICS | 322291 - Sanitary Paper Product Manufacturing |
SIC | 2676 - Sanitary Paper Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 109 |
Plant Area (Sq.Ft.) | 64,171 |
Annual Production | 30,000 Tons |
Production Hrs. Annual | 8,665 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,184,000 | 23,383,815 | kWh | $0.05 |
Electricity Demand | $337,124 | 38,082 | kW-months/year | $8.85 |
Electricity Fees | $12,184 | - | $ | - |
Natural Gas | $1,721,255 | 315,513 | MMBtu | $5.46 |
Fuel Oil #4 | $94,187 | 13,936 | MMBtu | $6.76 |
TOTAL ENERGY COSTS | $3,348,750 | |||
RECOMMENDED SAVINGS* | $417,031 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $343,101 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $112,689 Cost: $118,000 |
$(-3,460) | (-64,600) | $(-806) | (-90) | $116,955 | 19,525 | - | - | - | - |
$(-3,460) (-64,600) kWh |
$(-806) (-90) kW-months/year |
$116,955 19,525 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $91,341 Cost: $30,000 |
- | - | - | - | $91,341 | 14,904 | - | - | - | - |
- - kWh |
- - kW-months/year |
$91,341 14,904 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $64,338 Cost: $60,000 |
- | - | - | - | $64,338 | 10,723 | - | - | - | - |
- - kWh |
- - kW-months/year |
$64,338 10,723 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) |
Savings: $69,333 Cost: $5,900 |
- | - | - | - | $66,639 | 11,125 | $302 | - | $2,392 | - |
- - kWh |
- - kW-months/year |
$66,639 11,125 MMBtu |
$302 - $ |
$2,392 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $20,935 Cost: $22,000 |
$16,997 | 317,400 | $3,938 | 440 | - | - | - | - | - | - |
$16,997 317,400 kWh |
$3,938 440 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $16,568 Cost: $8,480 |
- | - | - | - | $16,568 | 2,766 | - | - | - | - |
- - kWh |
- - kW-months/year |
$16,568 2,766 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,205 Cost: $11,500 |
$9,909 | 185,000 | $2,296 | 256 | - | - | - | - | - | - |
$9,909 185,000 kWh |
$2,296 256 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,766 Cost: $11,500 |
$6,305 | 117,700 | $1,461 | 163 | - | - | - | - | - | - |
$6,305 117,700 kWh |
$1,461 163 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,484 Cost: $11,500 |
$5,264 | 98,300 | $1,220 | 136 | - | - | - | - | - | - |
$5,264 98,300 kWh |
$1,220 136 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,400 Cost: $2,600 |
- | - | - | - | $5,400 | 900 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,400 900 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,456 Cost: $8,000 |
$3,618 | 67,400 | $838 | 94 | - | - | - | - | - | - |
$3,618 67,400 kWh |
$838 94 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4145 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE |
Savings: $3,444 Cost: $2,250 |
$3,444 | 64,300 | - | - | - | - | - | - | - | - |
$3,444 64,300 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,072 Cost: $7,350 |
$2,072 | 38,800 | - | - | - | - | - | - | - | - |
$2,072 38,800 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $417,031 Cost: $299,080 |
$44,149 | 824,300 | $8,947 | 999 | $361,241 | 59,943 | $302 | - | $2,392 | - | $44,149 824,300 kWh |
$8,947 999 kW-months/year |
$361,241 59,943 MMBtu |
$302 - $ |
$2,392 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $343,101 Cost: $216,500 |
$(-3,460) | (-64,600) | $(-806) | (-90) | $344,673 | 57,177 | $302 | - | $2,392 | - | $(-3,460) (-64,600) kWh |
$(-806) (-90) kW-months/year |
$344,673 57,177 MMBtu |
$302 - $ |
$2,392 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Water Consumption |