IAC Assessment: MA0536
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0536
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2003
Principal Product Tissue paper
NAICS 322291 - Sanitary Paper Product Manufacturing
SIC 2676 - Sanitary Paper Products
Sales $10,000,000-$50,000,000
# of Employees 109
Plant Area (Sq.Ft.) 64,171
Annual Production 30,000 Tons
Production Hrs. Annual 8,665
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,184,000 23,383,815 kWh $0.05
Electricity Demand $337,124 38,082 kW-months/year $8.85
Electricity Fees $12,184 - $ -
Natural Gas $1,721,255 315,513 MMBtu $5.46
Fuel Oil #4 $94,187 13,936 MMBtu $6.76
TOTAL ENERGY COSTS $3,348,750
RECOMMENDED SAVINGS* $417,031 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $343,101
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$112,689
Cost:
$118,000
$(-3,460) (-64,600) $(-806) (-90) $116,955 19,525 - - - - $(-3,460)
(-64,600)
kWh
$(-806)
(-90)
kW-months/year
$116,955
19,525
MMBtu
-
-
$
-
-
Tgal
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$91,341
Cost:
$30,000
- - - - $91,341 14,904 - - - - -
-
kWh
-
-
kW-months/year
$91,341
14,904
MMBtu
-
-
$
-
-
Tgal
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$64,338
Cost:
$60,000
- - - - $64,338 10,723 - - - - -
-
kWh
-
-
kW-months/year
$64,338
10,723
MMBtu
-
-
$
-
-
Tgal
04: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) Savings:
$69,333
Cost:
$5,900
- - - - $66,639 11,125 $302 - $2,392 - -
-
kWh
-
-
kW-months/year
$66,639
11,125
MMBtu
$302
-
$
$2,392
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,935
Cost:
$22,000
$16,997 317,400 $3,938 440 - - - - - - $16,997
317,400
kWh
$3,938
440
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$16,568
Cost:
$8,480
- - - - $16,568 2,766 - - - - -
-
kWh
-
-
kW-months/year
$16,568
2,766
MMBtu
-
-
$
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,205
Cost:
$11,500
$9,909 185,000 $2,296 256 - - - - - - $9,909
185,000
kWh
$2,296
256
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,766
Cost:
$11,500
$6,305 117,700 $1,461 163 - - - - - - $6,305
117,700
kWh
$1,461
163
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,484
Cost:
$11,500
$5,264 98,300 $1,220 136 - - - - - - $5,264
98,300
kWh
$1,220
136
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,400
Cost:
$2,600
- - - - $5,400 900 - - - - -
-
kWh
-
-
kW-months/year
$5,400
900
MMBtu
-
-
$
-
-
Tgal
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,456
Cost:
$8,000
$3,618 67,400 $838 94 - - - - - - $3,618
67,400
kWh
$838
94
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
12: 2.4145 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE Savings:
$3,444
Cost:
$2,250
$3,444 64,300 - - - - - - - - $3,444
64,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,072
Cost:
$7,350
$2,072 38,800 - - - - - - - - $2,072
38,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$417,031
Cost:
$299,080
$44,149 824,300 $8,947 999 $361,241 59,943 $302 - $2,392 - $44,149
824,300
kWh
$8,947
999
kW-months/year
$361,241
59,943
MMBtu
$302
-
$
$2,392
-
Tgal
TOTAL IMPLEMENTED Savings:
$343,101
Cost:
$216,500
$(-3,460) (-64,600) $(-806) (-90) $344,673 57,177 $302 - $2,392 - $(-3,460)
(-64,600)
kWh
$(-806)
(-90)
kW-months/year
$344,673
57,177
MMBtu
$302
-
$
$2,392
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption