IAC logo
IAC Assessment: MA0540
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0540
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2003
Principal Product Plastic containers
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 105,000
Annual Production 8,400,000 Pieces
Production Hrs. Annual 8,520
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,091,759 43,448,154 kWh $0.07
Electricity Demand $710,839 74,417 kW-months/year $9.55
Electricity Fees $3,833 - $ -
Natural Gas $53,433 6,333 MMBtu $8.44
TOTAL ENERGY COSTS $3,859,864
RECOMMENDED SAVINGS* $2,138,058 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,968
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$1,726,195
Cost:
$11,884,320
$3,096,462 43,448,154 $710,839 74,417 $(-2,194,856) (-366,420) - - $113,750 - $3,096,462
43,448,154
kWh
$710,839
74,417
kW-months/year
$(-2,194,856)
(-366,420)
MMBtu
-
-
$
$113,750
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$50,349
Cost:
$28,595
$50,349 800,065 - - - - - - - - $50,349
800,065
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$32,261
Cost:
$17,920
$32,261 470,966 - - - - - - - - $32,261
470,966
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,447
Cost:
$7,000
$12,447 181,700 - - - - - - - - $12,447
181,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$10,042
Cost:
$6,200
$10,042 146,600 - - - - - - - - $10,042
146,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$295,995
Cost:
$436,450
$259,385 3,787,000 $36,610 5,320 - - - - - - $259,385
3,787,000
kWh
$36,610
5,320
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,220
Cost:
$650
$1,322 19,700 - - $3,898 517 - - - - $1,322
19,700
kWh
-
-
kW-months/year
$3,898
517
MMBtu
-
-
$
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,581
Cost:
$5,497
$2,841 41,473 $740 99 - - - - - - $2,841
41,473
kWh
$740
99
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,968
Cost:
$15,662
$234 3,400 $37 5 - - $1,697 - - - $234
3,400
kWh
$37
5
kW-months/year
-
-
MMBtu
$1,697
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$2,138,058
Cost:
$12,402,294
$3,465,343 48,899,058 $748,226 79,841 $(-2,190,958) (-365,903) $1,697 - $113,750 - $3,465,343
48,899,058
kWh
$748,226
79,841
kW-months/year
$(-2,190,958)
(-365,903)
MMBtu
$1,697
-
$
$113,750
-
$
TOTAL IMPLEMENTED Savings:
$1,968
Cost:
$15,662
$234 3,400 $37 5 - - $1,697 - - - $234
3,400
kWh
$37
5
kW-months/year
-
-
MMBtu
$1,697
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product