Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2003 |
Principal Product | Large circuit boards |
NAICS | 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679 - Electronic Components, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 407 |
Plant Area (Sq.Ft.) | 214,000 |
Annual Production | 420,000 Thousand Feet |
Production Hrs. Annual | 8,424 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,834,620 | 22,271,991 | kWh | $0.08 |
Electricity Demand | $367,805 | 43,021 | kW-months/year | $8.55 |
Electricity Fees | $5,699 | - | $ | - |
Natural Gas | $680,537 | 109,715 | MMBtu | $6.20 |
TOTAL ENERGY COSTS | $2,888,661 | |||
RECOMMENDED SAVINGS* | $157,763 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,922 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $89,343 Cost: $700,000 |
$543,042 | 8,619,711 | $85,000 | 1,000 | $(-495,600) | (-72,000) | - | - | $(-43,099) | - |
$543,042 8,619,711 kWh |
$85,000 1,000 kW-months/year |
$(-495,600) (-72,000) MMBtu |
- - $ |
$(-43,099) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $24,861 Cost: $46,350 |
$24,861 | 394,620 | - | - | - | - | - | - | - | - |
$24,861 394,620 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $14,763 Cost: $14,000 |
$12,383 | 196,556 | $2,380 | 280 | - | - | - | - | - | - |
$12,383 196,556 kWh |
$2,380 280 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $12,264 Cost: $5,500 |
- | - | - | - | $12,264 | 1,753 | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,264 1,753 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,600 Cost: $22,000 |
- | - | - | - | - | - | $5,600 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,600 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $5,023 Cost: $5,000 |
- | - | - | - | $5,023 | 670 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,023 670 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,751 Cost: - |
$4,751 | 75,412 | - | - | - | - | - | - | - | - |
$4,751 75,412 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $635 Cost: $260 |
- | - | - | - | $635 | 85 | - | - | - | - |
- - kWh |
- - kW-months/year |
$635 85 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $523 Cost: $72 |
- | - | - | - | $523 | 70 | - | - | - | - |
- - kWh |
- - kW-months/year |
$523 70 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $157,763 Cost: $793,182 |
$585,037 | 9,286,299 | $87,380 | 1,280 | $(-477,155) | (-69,422) | $5,600 | - | $(-43,099) | - | $585,037 9,286,299 kWh |
$87,380 1,280 kW-months/year |
$(-477,155) (-69,422) MMBtu |
$5,600 - $ |
$(-43,099) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,922 Cost: $10,760 |
- | - | - | - | $17,922 | 2,508 | - | - | - | - | - - kWh |
- - kW-months/year |
$17,922 2,508 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | By-product Production |