IAC logo
IAC Assessment: MA0545
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0545
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2003
Principal Product Medium to heavy metal gauge plate products
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 69,000
Annual Production 0 Units
Production Hrs. Annual 4,070
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,632 761,602 kWh $0.08
Electricity Demand $23,124 3,408 kW-months/year $6.79
Electricity Fees $799 - $ -
Natural Gas $21,800 2,536 MMBtu $8.60
TOTAL ENERGY COSTS $108,355
RECOMMENDED SAVINGS* $5,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,813
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,190
Cost:
-
- - $2,190 175 - - -
-
kWh
$2,190
175
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,737
Cost:
$2,750
- - - - $1,737 209 -
-
kWh
-
-
kW-months/year
$1,737
209
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$867
Cost:
$340
$867 11,100 - - - - $867
11,100
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$601
Cost:
-
$601 7,700 - - - - $601
7,700
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$219
Cost:
-
$219 2,800 - - - - $219
2,800
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$199
Cost:
$795
$199 2,550 - - - - $199
2,550
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,813
Cost:
$3,885
$1,886 24,150 $2,190 175 $1,737 209 $1,886
24,150
kWh
$2,190
175
kW-months/year
$1,737
209
MMBtu
TOTAL IMPLEMENTED Savings:
$5,813
Cost:
$3,885
$1,886 24,150 $2,190 175 $1,737 209 $1,886
24,150
kWh
$2,190
175
kW-months/year
$1,737
209
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas