Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2004 |
Principal Product | Aluminum die casting |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3363 - Aluminum Die-castings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 367,000 |
Annual Production | 3,000,000 Pounds |
Production Hrs. Annual | 4,000 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $654,232 | 7,616,587 | kWh | $0.09 |
Electricity Demand | $107,058 | 24,147 | kW-months/year | $4.43 |
Electricity Fees | $991 | - | $ | - |
Natural Gas | $340,147 | 36,850 | MMBtu | $9.23 |
Fuel Oil #2 | $73,688 | 14,000 | MMBtu | $5.26 |
TOTAL ENERGY COSTS | $1,233,928 | |||
RECOMMENDED SAVINGS* | $82,888 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $49,786 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $32,668 Cost: $15,495 |
$49,925 | 615,600 | - | - | $(-17,257) | (-2,553) | - | - | - | - |
$49,925 615,600 kWh |
- - kW-months/year |
$(-17,257) (-2,553) MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,739 Cost: $8,525 |
$16,739 | 200,900 | - | - | - | - | - | - | - | - |
$16,739 200,900 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $10,668 Cost: $2,066 |
$668 | 8,100 | - | - | - | - | - | - | $10,000 | - |
$668 8,100 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$10,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $8,653 Cost: $16,100 |
- | - | - | - | $8,653 | 1,280 | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,653 1,280 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS |
Savings: $5,232 Cost: $11,500 |
- | - | - | - | $5,232 | 744 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,232 744 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $4,412 Cost: - |
- | - | - | - | - | - | $4,412 | 739 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,412 739 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,794 Cost: $315 |
$1,794 | 23,516 | - | - | - | - | - | - | - | - |
$1,794 23,516 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,041 Cost: $896 |
$1,041 | 14,700 | - | - | - | - | - | - | - | - |
$1,041 14,700 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $1,021 Cost: $1,100 |
- | - | - | - | $1,021 | 151 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,021 151 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $463 Cost: $451 |
- | - | - | - | $463 | 88 | - | - | - | - |
- - kWh |
- - kW-months/year |
$463 88 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7122 DISCONNECT BALLASTS |
Savings: $197 Cost: $60 |
$165 | 2,000 | $32 | 6 | - | - | - | - | - | - |
$165 2,000 kWh |
$32 6 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,888 Cost: $56,508 |
$70,332 | 864,816 | $32 | 6 | $(-1,888) | (-290) | $4,412 | 739 | $10,000 | - | $70,332 864,816 kWh |
$32 6 kW-months/year |
$(-1,888) (-290) MMBtu |
$4,412 739 MMBtu |
$10,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $49,786 Cost: $33,966 |
$52,925 | 655,816 | $32 | 6 | $(-7,583) | (-1,122) | $4,412 | 739 | - | - | $52,925 655,816 kWh |
$32 6 kW-months/year |
$(-7,583) (-1,122) MMBtu |
$4,412 739 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes |