IAC Assessment: MA0552
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0552
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Bread based food products
NAICS 311821 - Cookie and Cracker Manufacturing
SIC 2050 -
Sales $50,000,000-$100,000,000
# of Employees 220
Plant Area (Sq.Ft.) 250,000
Annual Production 19,200,000 Pounds
Production Hrs. Annual 4,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $399,602 3,854,400 kWh $0.10
Electricity Demand $205,361 11,336 kW-months/year $18.12
Electricity Fees $(-49,202) - $ -
Natural Gas $669,743 73,364 MMBtu $9.13
TOTAL ENERGY COSTS $1,280,628
RECOMMENDED SAVINGS* $193,448 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,186
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$93,689
Cost:
$21,360
$(-2,311) (-21,600) - - - - - - $96,000 - $(-2,311)
(-21,600)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$96,000
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,401
Cost:
$31,625
- - - - $17,401 2,021 - - - - -
-
kWh
-
-
kW-months/year
$17,401
2,021
MMBtu
-
-
Tgal
-
-
$
03: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$14,380
Cost:
$4,000
- - - - - - $14,380 7,077,026 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,380
7,077,026
Tgal
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,043
Cost:
$4,730
- - - - $7,043 818 - - - - -
-
kWh
-
-
kW-months/year
$7,043
818
MMBtu
-
-
Tgal
-
-
$
05: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$5,846
Cost:
$17,600
- - - - $5,846 679 - - - - -
-
kWh
-
-
kW-months/year
$5,846
679
MMBtu
-
-
Tgal
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,209
Cost:
$1,643
- - - - $5,209 605 - - - - -
-
kWh
-
-
kW-months/year
$5,209
605
MMBtu
-
-
Tgal
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,686
Cost:
$285
- - - - $2,686 312 - - - - -
-
kWh
-
-
kW-months/year
$2,686
312
MMBtu
-
-
Tgal
-
-
$
08: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$428
Cost:
$18,000
$428 4,000 - - - - - - - - $428
4,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$31,340
Cost:
$3,749
$31,340 293,100 - - - - - - - - $31,340
293,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,426
Cost:
$49,385
$14,006 130,900 $1,420 216 - - - - - - $14,006
130,900
kWh
$1,420
216
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$193,448
Cost:
$152,377
$43,463 406,400 $1,420 216 $38,185 4,435 $14,380 7,077,026 $96,000 - $43,463
406,400
kWh
$1,420
216
kW-months/year
$38,185
4,435
MMBtu
$14,380
7,077,026
Tgal
$96,000
-
$
TOTAL IMPLEMENTED Savings:
$37,186
Cost:
$21,349
$31,340 293,100 - - $5,846 679 - - - - $31,340
293,100
kWh
-
-
kW-months/year
$5,846
679
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes