IAC Assessment: MA0554
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Flat tissue paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 80,000
Annual Production 24,000 Tons
Production Hrs. Annual 8,472
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,739,010 25,486,800 kWh $0.07
Electricity Demand $394,283 42,748 kW-months/year $9.22
Electricity Fees $3,741 - $ -
Fuel Oil #6 $1,074,251 222,900 MMBtu $4.82
TOTAL ENERGY COSTS $3,211,285
RECOMMENDED SAVINGS* $1,060,425 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,114
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Wood Electricity Usage Electricity Demand Fuel Oil #6 Wood
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$872,428
Cost:
$2,632,200
$216,845 3,188,900 $42,525 4,500 $1,136,051 218,471 $(-522,993) (-222,930) $216,845
3,188,900
kWh
$42,525
4,500
kW-months/year
$1,136,051
218,471
MMBtu
$(-522,993)
(-222,930)
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$119,550
Cost:
$175,000
$(-17,190) (-252,740) $(-3,400) (-358) $140,140 26,950 - - $(-17,190)
(-252,740)
kWh
$(-3,400)
(-358)
kW-months/year
$140,140
26,950
MMBtu
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$48,636
Cost:
$76,341
- - - - $48,636 9,353 - - -
-
kWh
-
-
kW-months/year
$48,636
9,353
MMBtu
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,697
Cost:
$11,100
$9,779 143,600 $1,918 203 - - - - $9,779
143,600
kWh
$1,918
203
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$6,330
Cost:
$8,961
$5,290 77,700 $1,040 110 - - - - $5,290
77,700
kWh
$1,040
110
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.2123 INSULATE FEEDWATER TANK Savings:
$1,784
Cost:
$1,300
- - - - $1,784 343 - - -
-
kWh
-
-
kW-months/year
$1,784
343
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$1,060,425
Cost:
$2,904,902
$214,724 3,157,460 $42,083 4,455 $1,326,611 255,117 $(-522,993) (-222,930) $214,724
3,157,460
kWh
$42,083
4,455
kW-months/year
$1,326,611
255,117
MMBtu
$(-522,993)
(-222,930)
MMBtu
TOTAL IMPLEMENTED Savings:
$8,114
Cost:
$10,261
$5,290 77,700 $1,040 110 $1,784 343 - - $5,290
77,700
kWh
$1,040
110
kW-months/year
$1,784
343
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #6 Wood Electricity Usage Electricity Demand Fuel Oil #6 Wood