Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2004 |
Principal Product | Flat tissue paper |
NAICS | 322121 - Paper (except Newsprint) Mills |
SIC | 2621 - Paper Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 24,000 Tons |
Production Hrs. Annual | 8,472 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,739,010 | 25,486,800 | kWh | $0.07 |
Electricity Demand | $394,283 | 42,748 | kW-months/year | $9.22 |
Electricity Fees | $3,741 | - | $ | - |
Fuel Oil #6 | $1,074,251 | 222,900 | MMBtu | $4.82 |
TOTAL ENERGY COSTS | $3,211,285 | |||
RECOMMENDED SAVINGS* | $1,060,425 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,114 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Wood | Electricity Usage | Electricity Demand | Fuel Oil #6 | Wood | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
Savings: $872,428 Cost: $2,632,200 |
$216,845 | 3,188,900 | $42,525 | 4,500 | $1,136,051 | 218,471 | $(-522,993) | (-222,930) |
$216,845 3,188,900 kWh |
$42,525 4,500 kW-months/year |
$1,136,051 218,471 MMBtu |
$(-522,993) (-222,930) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $119,550 Cost: $175,000 |
$(-17,190) | (-252,740) | $(-3,400) | (-358) | $140,140 | 26,950 | - | - |
$(-17,190) (-252,740) kWh |
$(-3,400) (-358) kW-months/year |
$140,140 26,950 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $48,636 Cost: $76,341 |
- | - | - | - | $48,636 | 9,353 | - | - |
- - kWh |
- - kW-months/year |
$48,636 9,353 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $11,697 Cost: $11,100 |
$9,779 | 143,600 | $1,918 | 203 | - | - | - | - |
$9,779 143,600 kWh |
$1,918 203 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $6,330 Cost: $8,961 |
$5,290 | 77,700 | $1,040 | 110 | - | - | - | - |
$5,290 77,700 kWh |
$1,040 110 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2123 INSULATE FEEDWATER TANK |
Savings: $1,784 Cost: $1,300 |
- | - | - | - | $1,784 | 343 | - | - |
- - kWh |
- - kW-months/year |
$1,784 343 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,060,425 Cost: $2,904,902 |
$214,724 | 3,157,460 | $42,083 | 4,455 | $1,326,611 | 255,117 | $(-522,993) | (-222,930) | $214,724 3,157,460 kWh |
$42,083 4,455 kW-months/year |
$1,326,611 255,117 MMBtu |
$(-522,993) (-222,930) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,114 Cost: $10,261 |
$5,290 | 77,700 | $1,040 | 110 | $1,784 | 343 | - | - | $5,290 77,700 kWh |
$1,040 110 kW-months/year |
$1,784 343 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Wood | Electricity Usage | Electricity Demand | Fuel Oil #6 | Wood |