IAC Assessment: MA0555
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0555
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Automotive components
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 267
Plant Area (Sq.Ft.) 360,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 6,144
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,016,591 19,373,978 kWh $0.05
Electricity Demand $180,052 28,507 kW-months/year $6.32
Natural Gas $583,933 60,486 MMBtu $9.65
LPG $94,585 11,984 MMBtu $7.89
TOTAL ENERGY COSTS $1,903,865
RECOMMENDED SAVINGS* $243,653 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $243,653
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$212,625
Cost:
$986,100
$192,593 2,663,800 $20,032 2,622 - - - - $192,593
2,663,800
kWh
$20,032
2,622
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,690
Cost:
$81,637
$34,950 483,400 $1,933 253 $(-20,193) (-2,050) - - $34,950
483,400
kWh
$1,933
253
kW-months/year
$(-20,193)
(-2,050)
MMBtu
-
-
MMBtu
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$1,915
Cost:
$44,790
$795 11,000 - - $1,120 1,142 - - $795
11,000
kWh
-
-
kW-months/year
$1,120
1,142
MMBtu
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,282
Cost:
$5,430
$3,282 45,400 - - - - - - $3,282
45,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,840
Cost:
$500
- - - - - - $2,840 360 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,840
360
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,791
Cost:
$4,850
$2,791 38,600 - - - - - - $2,791
38,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,836
Cost:
$768
$1,836 25,400 - - - - - - $1,836
25,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,139
Cost:
$650
- - - - $1,139 118 - - -
-
kWh
-
-
kW-months/year
$1,139
118
MMBtu
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$535
Cost:
$180
$535 7,400 - - - - - - $535
7,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$243,653
Cost:
$1,124,905
$236,782 3,275,000 $21,965 2,875 $(-17,934) (-790) $2,840 360 $236,782
3,275,000
kWh
$21,965
2,875
kW-months/year
$(-17,934)
(-790)
MMBtu
$2,840
360
MMBtu
TOTAL IMPLEMENTED Savings:
$243,653
Cost:
$1,124,905
$236,782 3,275,000 $21,965 2,875 $(-17,934) (-790) $2,840 360 $236,782
3,275,000
kWh
$21,965
2,875
kW-months/year
$(-17,934)
(-790)
MMBtu
$2,840
360
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG