IAC Assessment: MA0560
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0560
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Thermal coatings
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 65,000
Annual Production 168,000 Pieces
Production Hrs. Annual 4,420
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $331,174 5,017,790 kWh $0.07
Electricity Demand $135,061 17,655 kW-months/year $7.65
Electricity Fees $13,600 - $ -
Natural Gas $253,193 26,274 MMBtu $9.64
TOTAL ENERGY COSTS $754,461
RECOMMENDED SAVINGS* $81,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $81,930
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$42,752
Cost:
$238,150
$35,316 497,400 $7,436 927 - - $35,316
497,400
kWh
$7,436
927
kW-months/year
-
-
MMBtu
02: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$32,756
Cost:
$23,710
$756 10,500 - - $32,000 3,482 $756
10,500
kWh
-
-
kW-months/year
$32,000
3,482
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,875
Cost:
$1,200
- - $5,875 768 - - -
-
kWh
$5,875
768
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$317
Cost:
$256
$317 4,800 - - - - $317
4,800
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$230
Cost:
$175
- - - - $230 25 -
-
kWh
-
-
kW-months/year
$230
25
MMBtu
TOTAL RECOMMENDED Savings:
$81,930
Cost:
$263,491
$36,389 512,700 $13,311 1,695 $32,230 3,507 $36,389
512,700
kWh
$13,311
1,695
kW-months/year
$32,230
3,507
MMBtu
TOTAL IMPLEMENTED Savings:
$81,930
Cost:
$263,491
$36,389 512,700 $13,311 1,695 $32,230 3,507 $36,389
512,700
kWh
$13,311
1,695
kW-months/year
$32,230
3,507
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas