IAC logo
IAC Assessment: MA0567
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0567
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Recycled tissue paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 50,000
Annual Production 25,000 Tons
Production Hrs. Annual 8,640
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $841,943 15,505,000 kWh $0.05
Electricity Demand $388,737 48,801 kW-months/year $7.97
Electricity Fees $31,982 - $ -
Fuel Oil #6 $1,032,051 225,424 MMBtu $4.58
TOTAL ENERGY COSTS $2,294,713
RECOMMENDED SAVINGS* $160,228 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,433
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Personnel Changes Administrative Changes Electricity Usage Fuel Oil #6 Personnel Changes Administrative Changes
$ kWh $ MMBtu $ $ $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$70,900
Cost:
$270,000
$(-3,500) (-65,350) - - - - $74,400 - $(-3,500)
(-65,350)
kWh
-
-
MMBtu
-
-
$
$74,400
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$61,633
Cost:
$54,474
- - $61,633 13,850 - - - - -
-
kWh
$61,633
13,850
MMBtu
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,220
Cost:
$11,950
$9,220 169,800 - - - - - - $9,220
169,800
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$8,762
Cost:
$1,000
- - - - $8,762 - - - -
-
kWh
-
-
MMBtu
$8,762
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,156
Cost:
$6,867
- - $4,156 934 - - - - -
-
kWh
$4,156
934
MMBtu
-
-
$
-
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$3,942
Cost:
$5,000
$3,942 72,600 - - - - - - $3,942
72,600
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,615
Cost:
$1,369
- - $1,615 363 - - - - -
-
kWh
$1,615
363
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$160,228
Cost:
$350,660
$9,662 177,050 $67,404 15,147 $8,762 - $74,400 - $9,662
177,050
kWh
$67,404
15,147
MMBtu
$8,762
-
$
$74,400
-
$
TOTAL IMPLEMENTED Savings:
$85,433
Cost:
$279,236
$(-3,500) (-65,350) $5,771 1,297 $8,762 - $74,400 - $(-3,500)
(-65,350)
kWh
$5,771
1,297
MMBtu
$8,762
-
$
$74,400
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Fuel Oil #6 Personnel Changes Administrative Changes Electricity Usage Fuel Oil #6 Personnel Changes Administrative Changes