IAC Assessment: MA0571
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0571
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2005
Principal Product Laminated barrier fabric
NAICS 313320 - Fabric Coating Mills
SIC 2295 - Coated Fabrics, Not Rubberized
Sales $10,000,000-$50,000,000
# of Employees 51
Plant Area (Sq.Ft.) 50,950
Annual Production 9,000 Thousand Feet
Production Hrs. Annual 5,620
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,205 2,460,000 kWh $0.08
Electricity Demand $35,399 7,764 kW-months/year $4.56
Electricity Fees $1,077 - $ -
Natural Gas $251,654 34,632 MMBtu $7.27
TOTAL ENERGY COSTS $481,335
RECOMMENDED SAVINGS* $176,206 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,545
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$97,224
Cost:
$319,500
- - - - $97,224 13,575 -
-
kWh
-
-
kW-months/year
$97,224
13,575
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$46,372
Cost:
$49,355
$(-2,693) (-31,400) - - $49,065 6,851 $(-2,693)
(-31,400)
kWh
-
-
kW-months/year
$49,065
6,851
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,977
Cost:
$25,856
$14,977 172,600 - - - - $14,977
172,600
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$7,370
Cost:
$1,900
- - - - $7,370 1,029 -
-
kWh
-
-
kW-months/year
$7,370
1,029
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,826
Cost:
$29,170
$8,109 94,400 $1,374 288 $(-2,657) (-372) $8,109
94,400
kWh
$1,374
288
kW-months/year
$(-2,657)
(-372)
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,702
Cost:
$1,962
$(-232) (-2,700) $(-29) (-6) $2,963 395 $(-232)
(-2,700)
kWh
$(-29)
(-6)
kW-months/year
$2,963
395
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$735
Cost:
$1,450
- - $735 154 - - -
-
kWh
$735
154
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$176,206
Cost:
$429,193
$20,161 232,900 $2,080 436 $153,965 21,478 $20,161
232,900
kWh
$2,080
436
kW-months/year
$153,965
21,478
MMBtu
TOTAL IMPLEMENTED Savings:
$75,545
Cost:
$106,281
$20,393 235,600 $1,374 288 $53,778 7,508 $20,393
235,600
kWh
$1,374
288
kW-months/year
$53,778
7,508
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas