Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2005 |
Principal Product | Laminated barrier fabric |
NAICS | 313320 - Fabric Coating Mills |
SIC | 2295 - Coated Fabrics, Not Rubberized |
Sales | $10,000,000-$50,000,000 |
# of Employees | 51 |
Plant Area (Sq.Ft.) | 50,950 |
Annual Production | 9,000 Thousand Feet |
Production Hrs. Annual | 5,620 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $193,205 | 2,460,000 | kWh | $0.08 |
Electricity Demand | $35,399 | 7,764 | kW-months/year | $4.56 |
Electricity Fees | $1,077 | - | $ | - |
Natural Gas | $251,654 | 34,632 | MMBtu | $7.27 |
TOTAL ENERGY COSTS | $481,335 | |||
RECOMMENDED SAVINGS* | $176,206 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,545 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $97,224 Cost: $319,500 |
- | - | - | - | $97,224 | 13,575 |
- - kWh |
- - kW-months/year |
$97,224 13,575 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $46,372 Cost: $49,355 |
$(-2,693) | (-31,400) | - | - | $49,065 | 6,851 |
$(-2,693) (-31,400) kWh |
- - kW-months/year |
$49,065 6,851 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,977 Cost: $25,856 |
$14,977 | 172,600 | - | - | - | - |
$14,977 172,600 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2212 USE MINIMUM SAFE OVEN VENTILATION |
Savings: $7,370 Cost: $1,900 |
- | - | - | - | $7,370 | 1,029 |
- - kWh |
- - kW-months/year |
$7,370 1,029 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,826 Cost: $29,170 |
$8,109 | 94,400 | $1,374 | 288 | $(-2,657) | (-372) |
$8,109 94,400 kWh |
$1,374 288 kW-months/year |
$(-2,657) (-372) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,702 Cost: $1,962 |
$(-232) | (-2,700) | $(-29) | (-6) | $2,963 | 395 |
$(-232) (-2,700) kWh |
$(-29) (-6) kW-months/year |
$2,963 395 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $735 Cost: $1,450 |
- | - | $735 | 154 | - | - |
- - kWh |
$735 154 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $176,206 Cost: $429,193 |
$20,161 | 232,900 | $2,080 | 436 | $153,965 | 21,478 | $20,161 232,900 kWh |
$2,080 436 kW-months/year |
$153,965 21,478 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,545 Cost: $106,281 |
$20,393 | 235,600 | $1,374 | 288 | $53,778 | 7,508 | $20,393 235,600 kWh |
$1,374 288 kW-months/year |
$53,778 7,508 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |