IAC logo
IAC Assessment: MA0572
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0572
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2005
Principal Product Wood furniture
NAICS 337122 - Nonupholstered Wood Household Furniture Manufacturing
SIC 2511 - Wood Household Furniture
Sales $5,000,000-$10,000,000
# of Employees 73
Plant Area (Sq.Ft.) 100,000
Annual Production 13,520 Pieces
Production Hrs. Annual 2,210
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,909 1,215,360 kWh $0.06
Electricity Demand $47,866 11,140 kW-months/year $4.30
LPG $5,060 350 MMBtu $14.46
Fuel Oil #2 $97,335 11,003 MMBtu $8.85
TOTAL ENERGY COSTS $229,170
RECOMMENDED SAVINGS* $78,089 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,089
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Electricity Usage Electricity Demand LPG Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$39,353
Cost:
$1,300
- - - - - - $39,353 4,095 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$39,353
4,095
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,571
Cost:
$4,080
$(-569) (-8,400) $(-101) (-12) - - $16,241 1,690 $(-569)
(-8,400)
kWh
$(-101)
(-12)
kW-months/year
-
-
MMBtu
$16,241
1,690
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,380
Cost:
$81,540
$7,065 94,320 $4,315 512 - - - - $7,065
94,320
kWh
$4,315
512
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,068
Cost:
$18,390
$3,767 50,300 $2,301 273 - - - - $3,767
50,300
kWh
$2,301
273
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,923
Cost:
$3,540
- - - - $1,923 200 - - -
-
kWh
-
-
kW-months/year
$1,923
200
MMBtu
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,790
Cost:
$750
$1,790 23,905 - - - - - - $1,790
23,905
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,200
Cost:
$2,830
- - - - - - $1,200 125 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,200
125
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$644
Cost:
$2,700
$644 8,600 - - - - - - $644
8,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$160
Cost:
$138
- - - - - - $160 17 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$160
17
MMBtu
TOTAL RECOMMENDED Savings:
$78,089
Cost:
$115,268
$12,697 168,725 $6,515 773 $1,923 200 $56,954 5,927 $12,697
168,725
kWh
$6,515
773
kW-months/year
$1,923
200
MMBtu
$56,954
5,927
MMBtu
TOTAL IMPLEMENTED Savings:
$78,089
Cost:
$115,268
$12,697 168,725 $6,515 773 $1,923 200 $56,954 5,927 $12,697
168,725
kWh
$6,515
773
kW-months/year
$1,923
200
MMBtu
$56,954
5,927
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand LPG Fuel Oil #2 Electricity Usage Electricity Demand LPG Fuel Oil #2