Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2005 |
Principal Product | Rolled copper and brass plates |
NAICS | 331420 - Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351 - Copper Rolling And Drawing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 600,000 |
Annual Production | 5,200,000 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $625,556 | 3,638,200 | kWh | $0.17 |
Electricity Demand | $107,657 | 19,900 | kW-months/year | $5.41 |
Natural Gas | $251,654 | 38,033 | MMBtu | $6.62 |
Fuel Oil #2 | $269,000 | 23,865 | MMBtu | $11.27 |
TOTAL ENERGY COSTS | $1,253,867 | |||
RECOMMENDED SAVINGS* | $698,132 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $328,112 |
#|Description |
Savings Cost |
Status | Electricity Demand | Natural Gas | Fuel Oil #2 | Fuel Oil #6 | Electricity Demand | Natural Gas | Fuel Oil #2 | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $179,823 Cost: $140,865 |
- | - | $(-24,956) | (-3,275) | $204,779 | 21,972 | - | - |
- - kW-months/year |
$(-24,956) (-3,275) MMBtu |
$204,779 21,972 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $140,952 Cost: $230,000 |
- | - | $140,952 | 9,249 | - | - | - | - |
- - kW-months/year |
$140,952 9,249 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $349,295 Cost: $54,400 |
- | - | - | - | $224,092 | 23,865 | $125,203 | (-23,865) |
- - kW-months/year |
- - MMBtu |
$224,092 23,865 MMBtu |
$125,203 (-23,865) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $20,725 Cost: $20,215 |
$20,725 | 3,831 | - | - | - | - | - | - |
$20,725 3,831 kW-months/year |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,466 Cost: $1,801 |
- | - | - | - | $3,466 | 369 | - | - |
- - kW-months/year |
- - MMBtu |
$3,466 369 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,911 Cost: $5,770 |
- | - | $2,911 | 382 | - | - | - | - |
- - kW-months/year |
$2,911 382 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $960 Cost: - |
- | - | $960 | 126 | - | - | - | - |
- - kW-months/year |
$960 126 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $698,132 Cost: $453,051 |
$20,725 | 3,831 | $119,867 | 6,482 | $432,337 | 46,206 | $125,203 | (-23,865) | $20,725 3,831 kW-months/year |
$119,867 6,482 MMBtu |
$432,337 46,206 MMBtu |
$125,203 (-23,865) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $328,112 Cost: $378,436 |
- | - | $119,867 | 6,482 | $208,245 | 22,341 | - | - | - - kW-months/year |
$119,867 6,482 MMBtu |
$208,245 22,341 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Demand | Natural Gas | Fuel Oil #2 | Fuel Oil #6 | Electricity Demand | Natural Gas | Fuel Oil #2 | Fuel Oil #6 |