IAC logo
IAC Assessment: MA0585
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0585
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2005
Principal Product specialty paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 50,000
Annual Production 25,000 Tons
Production Hrs. Annual 8,590
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,327,542 4,303,200 kWh $0.54
Electricity Demand $210,605 81,390 kW-months/year $2.59
Electricity Fees $157,628 - $ -
Fuel Oil #6 $1,032,051 240,010 MMBtu $4.30
TOTAL ENERGY COSTS $3,727,826
RECOMMENDED SAVINGS* $408,334 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $204,010
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Electricity Usage Electricity Demand Fuel Oil #6
$ kWh $ kW-months/year $ MMBtu
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$112,569
Cost:
$254,000
$106,327 1,389,900 $6,242 1,880 - - $106,327
1,389,900
kWh
$6,242
1,880
kW-months/year
-
-
MMBtu
02: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$91,755
Cost:
$254,400
- - - - $91,755 18,449 -
-
kWh
-
-
kW-months/year
$91,755
18,449
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$73,100
Cost:
$37,300
$68,920 900,900 $4,180 1,260 - - $68,920
900,900
kWh
$4,180
1,260
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$54,416
Cost:
$37,300
$51,309 670,700 $3,107 936 - - $51,309
670,700
kWh
$3,107
936
kW-months/year
-
-
MMBtu
05: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$29,239
Cost:
$23,014
- - - - $29,239 5,895 -
-
kWh
-
-
kW-months/year
$29,239
5,895
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,480
Cost:
$78,770
$26,430 345,500 $2,050 617 - - $26,430
345,500
kWh
$2,050
617
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,353
Cost:
$9,225
$6,933 90,600 $420 127 - - $6,933
90,600
kWh
$420
127
kW-months/year
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,385
Cost:
$5,300
$6,020 78,700 $365 110 - - $6,020
78,700
kWh
$365
110
kW-months/year
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,037
Cost:
$5,300
$4,751 62,100 $286 86 - - $4,751
62,100
kWh
$286
86
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$408,334
Cost:
$704,609
$270,690 3,538,400 $16,650 5,016 $120,994 24,344 $270,690
3,538,400
kWh
$16,650
5,016
kW-months/year
$120,994
24,344
MMBtu
TOTAL IMPLEMENTED Savings:
$204,010
Cost:
$196,209
$164,363 2,148,500 $10,408 3,136 $29,239 5,895 $164,363
2,148,500
kWh
$10,408
3,136
kW-months/year
$29,239
5,895
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #6 Electricity Usage Electricity Demand Fuel Oil #6