Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2005 |
Principal Product | Electro-plating |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 22,000 |
Annual Production | 3,500 Pounds |
Production Hrs. Annual | 4,680 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $103,837 | 1,232,400 | kWh | $0.08 |
Electricity Demand | $32,297 | 3,801 | kW-months/year | $8.50 |
Electricity Fees | $(-20,966) | - | $ | - |
Natural Gas | $84,399 | 9,294 | MMBtu | $9.08 |
Fuel Oil #2 | $56,448 | 7,609 | MMBtu | $7.42 |
TOTAL ENERGY COSTS | $256,015 | |||
RECOMMENDED SAVINGS* | $14,906 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,301 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,190 Cost: - |
- | - | $3,190 | 660 | - | - | - | - |
- - kWh |
$3,190 660 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $3,081 Cost: $140 |
$1,862 | 25,200 | $1,219 | 159 | - | - | - | - |
$1,862 25,200 kWh |
$1,219 159 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $3,200 Cost: - |
- | - | - | - | $2,200 | 250 | $1,000 | - |
- - kWh |
- - kW-months/year |
$2,200 250 MMBtu |
$1,000 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $2,415 Cost: $350 |
$2,415 | 32,675 | - | - | - | - | - | - |
$2,415 32,675 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8112 COMBINE UTILITY METERS |
Savings: $1,736 Cost: $1,950 |
- | - | - | - | $1,736 | - | - | - |
- - kWh |
- - kW-months/year |
$1,736 - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $841 Cost: $1,646 |
$480 | 6,500 | - | - | $361 | 41 | - | - |
$480 6,500 kWh |
- - kW-months/year |
$361 41 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $443 Cost: $1,395 |
$443 | 6,002 | - | - | - | - | - | - |
$443 6,002 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,906 Cost: $5,481 |
$5,200 | 70,377 | $4,409 | 819 | $4,297 | 291 | $1,000 | - | $5,200 70,377 kWh |
$4,409 819 kW-months/year |
$4,297 291 MMBtu |
$1,000 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,301 Cost: $5,131 |
$2,785 | 37,702 | $1,219 | 159 | $4,297 | 291 | $1,000 | - | $2,785 37,702 kWh |
$1,219 159 kW-months/year |
$4,297 291 MMBtu |
$1,000 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption |