Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2006 |
Principal Product | metal boxes and storage cabinets, plastic first aid kits |
NAICS | 332439 - Other Metal Container Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 257 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 12,000,000 Pounds |
Production Hrs. Annual | 6,975 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $288,435 | 3,921,764 | kWh | $0.07 |
Electricity Demand | $96,935 | 20,712 | kW-months/year | $4.68 |
Electricity Fees | $8,768 | - | $ | - |
LPG | $236,294 | 21,929 | MMBtu | $10.78 |
Fuel Oil #2 | $92,221 | 11,600 | MMBtu | $7.95 |
TOTAL ENERGY COSTS | $722,653 | |||
RECOMMENDED SAVINGS* | $107,405 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $50,928 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $35,080 Cost: $82,975 |
$29,040 | 382,100 | $6,040 | 657 | - | - | - | - |
$29,040 382,100 kWh |
$6,040 657 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.5196 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS |
Savings: $20,245 Cost: $77,830 |
$16,755 | 220,467 | $3,490 | 380 | - | - | - | - |
$16,755 220,467 kWh |
$3,490 380 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $26,565 Cost: $37,830 |
$13,435 | 176,800 | $4,411 | 480 | $8,719 | (-710) | - | - |
$13,435 176,800 kWh |
$4,411 480 kW-months/year |
$8,719 (-710) MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,411 Cost: $1,650 |
$6,134 | 80,704 | $1,277 | 139 | - | - | - | - |
$6,134 80,704 kWh |
$1,277 139 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $5,675 Cost: $1,820 |
$3,360 | 44,223 | $2,315 | 252 | - | - | - | - |
$3,360 44,223 kWh |
$2,315 252 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $5,143 Cost: $12,500 |
$5,143 | 67,673 | - | - | - | - | - | - |
$5,143 67,673 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,354 Cost: $5,390 |
- | - | - | - | - | - | $2,354 | 246 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,354 246 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $3,780 Cost: $5,264 |
- | - | - | - | - | - | $3,780 | 395 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,780 395 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,152 Cost: $260 |
$867 | 11,411 | $285 | 31 | - | - | - | - |
$867 11,411 kWh |
$285 31 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $107,405 Cost: $225,519 |
$74,734 | 983,378 | $17,818 | 1,939 | $8,719 | (-710) | $6,134 | 641 | $74,734 983,378 kWh |
$17,818 1,939 kW-months/year |
$8,719 (-710) MMBtu |
$6,134 641 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $50,928 Cost: $64,454 |
$28,072 | 369,400 | $8,003 | 871 | $8,719 | (-710) | $6,134 | 641 | $28,072 369,400 kWh |
$8,003 871 kW-months/year |
$8,719 (-710) MMBtu |
$6,134 641 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 |