IAC Assessment: MA0601
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0601
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2006
Principal Product Specialty paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 50,000
Annual Production 52,000 Tons
Production Hrs. Annual 8,590
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,327,542 39,192,000 kWh $0.06
Electricity Demand $274,478 82,674 kW-months/year $3.32
Electricity Fees $157,628 - $ -
Fuel Oil #6 $1,712,960 193,549 MMBtu $8.85
TOTAL ENERGY COSTS $4,472,608
RECOMMENDED SAVINGS* $241,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $164,538
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Electricity Usage Electricity Demand Fuel Oil #6
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$147,022
Cost:
$129,390
$144,452 1,819,300 $2,570 774 - - $144,452
1,819,300
kWh
$2,570
774
kW-months/year
-
-
MMBtu
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$71,974
Cost:
$10,118
- - - - $71,974 8,916 -
-
kWh
-
-
kW-months/year
$71,974
8,916
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,368
Cost:
$24,444
$9,305 117,200 $63 19 - - $9,305
117,200
kWh
$63
19
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,148
Cost:
$18,975
$7,829 98,600 $319 96 - - $7,829
98,600
kWh
$319
96
kW-months/year
-
-
MMBtu
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$5,090
Cost:
$2,300
$5,090 64,100 - - - - $5,090
64,100
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$241,602
Cost:
$185,227
$166,676 2,099,200 $2,952 889 $71,974 8,916 $166,676
2,099,200
kWh
$2,952
889
kW-months/year
$71,974
8,916
MMBtu
TOTAL IMPLEMENTED Savings:
$164,538
Cost:
$172,809
$161,586 2,035,100 $2,952 889 - - $161,586
2,035,100
kWh
$2,952
889
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #6 Electricity Usage Electricity Demand Fuel Oil #6